Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated assembly type vertical shaft type storage pond equipment layer structure and construction method
The invention discloses a prefabricated assembly type vertical shaft type storage pond equipment layer structure and a construction method. The prefabricated assembly type vertical shaft type storage pond equipment layer structure comprises a vertical shaft structure, and structural plates and walls which are arranged in the vertical shaft structure; the periphery of the structural plate is erected on a first bracket support on the inner wall of the vertical shaft structure; the first bracket support is annular, and a structure positioning groove is formed in the first bracket support; the structural slab comprises a plurality of prefabricated slab units and a net-shaped beam structure used for supporting each prefabricated slab unit. The net-shaped beam structure comprises more than two long precast beams and a plurality of short precast beams; during construction, firstly, the annular prefabricated pipe pieces, the special ring prefabricated pipe pieces, the long prefabricated beams, the short prefabricated beams and the prefabricated plate units are prefabricated; then a vertical shaft structure is assembled, and the long precast beams and the short precast beams are sequentially arranged in place to form a net-shaped beam structure; and finally, the prefabricated slab units are assembled. By arranging the positioning keys and the positioning grooves, horizontal constraint is enhanced, and the integrity of an equipment layer structure system and a shaft structure is enhanced.
本发明公开了预制拼装式竖井型调蓄池设备层结构及施工方法,包括竖井结构,以及设置在竖井结构内的结构板和墙;结构板周边架设在竖井结构内壁的第一牛腿支座上;第一牛腿支座呈环形,上面设有结构定位槽;结构板包括多个预制板单元,以及用于支撑每一预制板单元的网状梁结构;网状梁结构包括两根以上长预制梁和多根短预制梁;施工时,先预制环形预制管片、特殊环预制管片、长预制梁、短预制梁和预制板单元;然后拼装竖井结构,在依次就位长预制梁和短预制梁形成网状梁结构;最后拼装预制板单元。本发明通过设置定位键、定位槽,增强水平约束,增强设备层结构体系与井筒结构的整体性。
Prefabricated assembly type vertical shaft type storage pond equipment layer structure and construction method
The invention discloses a prefabricated assembly type vertical shaft type storage pond equipment layer structure and a construction method. The prefabricated assembly type vertical shaft type storage pond equipment layer structure comprises a vertical shaft structure, and structural plates and walls which are arranged in the vertical shaft structure; the periphery of the structural plate is erected on a first bracket support on the inner wall of the vertical shaft structure; the first bracket support is annular, and a structure positioning groove is formed in the first bracket support; the structural slab comprises a plurality of prefabricated slab units and a net-shaped beam structure used for supporting each prefabricated slab unit. The net-shaped beam structure comprises more than two long precast beams and a plurality of short precast beams; during construction, firstly, the annular prefabricated pipe pieces, the special ring prefabricated pipe pieces, the long prefabricated beams, the short prefabricated beams and the prefabricated plate units are prefabricated; then a vertical shaft structure is assembled, and the long precast beams and the short precast beams are sequentially arranged in place to form a net-shaped beam structure; and finally, the prefabricated slab units are assembled. By arranging the positioning keys and the positioning grooves, horizontal constraint is enhanced, and the integrity of an equipment layer structure system and a shaft structure is enhanced.
本发明公开了预制拼装式竖井型调蓄池设备层结构及施工方法,包括竖井结构,以及设置在竖井结构内的结构板和墙;结构板周边架设在竖井结构内壁的第一牛腿支座上;第一牛腿支座呈环形,上面设有结构定位槽;结构板包括多个预制板单元,以及用于支撑每一预制板单元的网状梁结构;网状梁结构包括两根以上长预制梁和多根短预制梁;施工时,先预制环形预制管片、特殊环预制管片、长预制梁、短预制梁和预制板单元;然后拼装竖井结构,在依次就位长预制梁和短预制梁形成网状梁结构;最后拼装预制板单元。本发明通过设置定位键、定位槽,增强水平约束,增强设备层结构体系与井筒结构的整体性。
Prefabricated assembly type vertical shaft type storage pond equipment layer structure and construction method
预制拼装式竖井型调蓄池设备层结构及施工方法
ZHANG YUHANG (Autor:in) / JIANG HONG (Autor:in) / HE TENGFEI (Autor:in) / LIN YONGMEI (Autor:in) / LIU FANGMING (Autor:in) / WANG XIN (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
Prefabricated assembly type vertical shaft type storage pond structure and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Ultra-deep intensive assembly type vertical shaft regulation and storage pond
Europäisches Patentamt | 2024
|