Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large-diameter inverted-cone-shaped concrete funnel and inclined wall construction method thereof
The invention provides a large-diameter inverted-cone-shaped concrete funnel and an inclined wall construction method thereof. The large-diameter inverted-cone-shaped concrete funnel comprises the following steps that firstly, an assembly type slip form platform is assembled; 2, silo wall slip form construction, wherein a construction section comprises the lower end of a silo wall to the highest position of a funnel wall; thirdly, an overhanging platform on the inner side of the silo wall is constructed, and the overhanging platform is arranged below the funnel wall; fourthly, connecting beams on the inner side of the silo wall are constructed, and the connecting beams are arranged between the silo wall and the funnel wall; and 5, funnel wall construction. By means of the method, inclined wall construction of the funnel wall of the ultra-large type coal preparation silo is achieved, and the safety and stability in the concrete funnel construction process are improved.
本发明提供一种大直径倒锥形混凝土漏斗及其斜壁施工方法,包括以下步骤:步骤一、装配式滑模平台组装;步骤二、仓壁滑模施工,施工段包括仓壁下端至漏斗壁最高位置;步骤三、仓壁内侧的悬挑平台施工,悬挑平台设置在漏斗壁下方;步骤四、仓壁内侧的连系梁施工,连系梁设置在仓壁和漏斗壁之间;步骤五、漏斗壁施工。该方法实现超大型备煤筒仓漏斗壁的斜壁施工,提高了混凝土漏斗施工过程中的安全稳定性。
Large-diameter inverted-cone-shaped concrete funnel and inclined wall construction method thereof
The invention provides a large-diameter inverted-cone-shaped concrete funnel and an inclined wall construction method thereof. The large-diameter inverted-cone-shaped concrete funnel comprises the following steps that firstly, an assembly type slip form platform is assembled; 2, silo wall slip form construction, wherein a construction section comprises the lower end of a silo wall to the highest position of a funnel wall; thirdly, an overhanging platform on the inner side of the silo wall is constructed, and the overhanging platform is arranged below the funnel wall; fourthly, connecting beams on the inner side of the silo wall are constructed, and the connecting beams are arranged between the silo wall and the funnel wall; and 5, funnel wall construction. By means of the method, inclined wall construction of the funnel wall of the ultra-large type coal preparation silo is achieved, and the safety and stability in the concrete funnel construction process are improved.
本发明提供一种大直径倒锥形混凝土漏斗及其斜壁施工方法,包括以下步骤:步骤一、装配式滑模平台组装;步骤二、仓壁滑模施工,施工段包括仓壁下端至漏斗壁最高位置;步骤三、仓壁内侧的悬挑平台施工,悬挑平台设置在漏斗壁下方;步骤四、仓壁内侧的连系梁施工,连系梁设置在仓壁和漏斗壁之间;步骤五、漏斗壁施工。该方法实现超大型备煤筒仓漏斗壁的斜壁施工,提高了混凝土漏斗施工过程中的安全稳定性。
Large-diameter inverted-cone-shaped concrete funnel and inclined wall construction method thereof
大直径倒锥形混凝土漏斗及其斜壁施工方法
ZHANG YONG (Autor:in) / HUANG FEI (Autor:in) / YANG JIAHAN (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
Construction method of large-gradient inverted conical funnel-shaped top plate
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Inverted-cone-shaped twisted surface aluminum plate curtain wall and construction method thereof
Europäisches Patentamt | 2024
|Arc-shaped one-way double-cable inverted-cone cable curtain wall construction method
Europäisches Patentamt | 2015
|