H-shaped steel main beam conversion device and secondary beam manufacturing and mounting process
The invention discloses an H-shaped steel main beam conversion device and a secondary beam manufacturing and installing process, and relates to the technical field of building steel-concrete structures, the H-shaped steel main beam and web connecting assembly comprises an H-shaped steel main beam web connecting assembly and a C-shaped steel secondary beam assembly, and the H-shaped steel main beam web connecting assembly comprises an H-shaped steel welding main connecting plate and a conversion box body; and one side surface of the H-shaped steel welding main connecting plate is fixedly connected with a web plate of the H-shaped steel main beam. The H steel welding main connecting plate and the conversion box body are formed by cutting and bending a whole plate, the H steel welding main connecting plate is directly attached to the web face of the H-shaped steel main beam, large-area welding and fixing are achieved, after welding is completed, it needs to be guaranteed that a gap is reserved between a secondary beam screw joint panel of the conversion box body and the lower surface of an upper wing plate of the H-shaped steel main beam, and therefore the conversion box body is formed. And finally, one ends of a pair of main beam screw joint plates of the C-shaped steel secondary beam assembly are inserted into the conversion box body and wrap the conversion box body to obtain outer wrapping force and clamping force, resultant force conversion is achieved, and more reliable main beam and secondary beam connection and installation are obtained.
本发明公开一种H型钢主梁转换装置及次梁制造安装工艺,涉建筑钢混结构技术领域,包括H型钢主梁腹板连接组件和C型钢次梁组件,所述H型钢主梁腹板连接组件包括H钢焊接主连接板和转换箱体,所述H钢焊接主连接板的一侧面与H型钢主梁的腹板固定连接。本发明H钢焊接主连接板和转换箱体采用一整块板裁剪折弯而成,H钢焊接主连接板直接贴合在H型钢主梁的腹板面,实现大面积的焊接固定,焊接完成后需要保证转换箱体的次梁螺接面板与H型钢主梁上翼板下表面间预留缝隙,最终将C型钢次梁组件一对主梁螺接板一端插入到转换箱体,并包裹在转换箱体外获得外包力和钳制力,实现合力转换,获得更加可靠的主次梁连接安装。
H-shaped steel main beam conversion device and secondary beam manufacturing and mounting process
The invention discloses an H-shaped steel main beam conversion device and a secondary beam manufacturing and installing process, and relates to the technical field of building steel-concrete structures, the H-shaped steel main beam and web connecting assembly comprises an H-shaped steel main beam web connecting assembly and a C-shaped steel secondary beam assembly, and the H-shaped steel main beam web connecting assembly comprises an H-shaped steel welding main connecting plate and a conversion box body; and one side surface of the H-shaped steel welding main connecting plate is fixedly connected with a web plate of the H-shaped steel main beam. The H steel welding main connecting plate and the conversion box body are formed by cutting and bending a whole plate, the H steel welding main connecting plate is directly attached to the web face of the H-shaped steel main beam, large-area welding and fixing are achieved, after welding is completed, it needs to be guaranteed that a gap is reserved between a secondary beam screw joint panel of the conversion box body and the lower surface of an upper wing plate of the H-shaped steel main beam, and therefore the conversion box body is formed. And finally, one ends of a pair of main beam screw joint plates of the C-shaped steel secondary beam assembly are inserted into the conversion box body and wrap the conversion box body to obtain outer wrapping force and clamping force, resultant force conversion is achieved, and more reliable main beam and secondary beam connection and installation are obtained.
本发明公开一种H型钢主梁转换装置及次梁制造安装工艺,涉建筑钢混结构技术领域,包括H型钢主梁腹板连接组件和C型钢次梁组件,所述H型钢主梁腹板连接组件包括H钢焊接主连接板和转换箱体,所述H钢焊接主连接板的一侧面与H型钢主梁的腹板固定连接。本发明H钢焊接主连接板和转换箱体采用一整块板裁剪折弯而成,H钢焊接主连接板直接贴合在H型钢主梁的腹板面,实现大面积的焊接固定,焊接完成后需要保证转换箱体的次梁螺接面板与H型钢主梁上翼板下表面间预留缝隙,最终将C型钢次梁组件一对主梁螺接板一端插入到转换箱体,并包裹在转换箱体外获得外包力和钳制力,实现合力转换,获得更加可靠的主次梁连接安装。
H-shaped steel main beam conversion device and secondary beam manufacturing and mounting process
一种H型钢主梁转换装置及次梁制造安装工艺
XIA LIQIN (Autor:in) / XIA ZHUSHI (Autor:in)
17.05.2024
Patent
Elektronische Ressource
Chinesisch