Steel plate shear wall assembly and construction method
The invention discloses a steel plate shear wall assembly and a construction method, the steel plate shear wall assembly comprises a plurality of side columns, wallboard components, clamping fixing pieces and connecting pieces, the plurality of wallboard components are detachably connected between two adjacent side columns through the clamping fixing pieces, and the adjacent wallboard components are detachably connected through the connecting pieces. The construction method comprises the following steps: detachably fixing the clamping fixing piece and the side column; the wallboard components are detachably assembled between the two adjacent side columns through the clamping and fixing pieces; and the wallboards and the side columns are fixed in a spot welding mode to form the complete shear wall. According to the steel plate shear wall assembly and the construction method, the wallboard components can be conveniently positioned by arranging the clamping fixing pieces on the side columns, the end faces of the adjacent wallboard components can be kept flat through the connecting pieces, dependence on constructors is reduced, the cost is saved, and the construction efficiency is improved.
一种钢板剪力墙总成及施工方法,该钢板剪力墙总成包括若干侧柱、墙板构件、夹紧固定件及连接件,若干所述墙板构件通过所述夹紧固定件可拆卸连接在相邻的两个所述侧柱之间,且相邻的所述墙板构件之间通过连接件可拆卸连接,该施工方法包括如下步骤:将所述夹紧固定件与所述侧柱进行可拆卸固定;将所述墙板构件通过所述夹紧固定件可拆卸的装配在两相邻的所述侧柱之间;将墙板与侧柱之间进行点焊固定形成完整的剪力墙。该钢板剪力墙总成及施工方法,通过在侧柱上设置夹紧固定件,能够方便的对墙板构件进行定位,连接件还可以使得相邻的墙板构件的端面之间保持平整,减少对施工人员的依赖,节省了成本,提升了施工效率。
Steel plate shear wall assembly and construction method
The invention discloses a steel plate shear wall assembly and a construction method, the steel plate shear wall assembly comprises a plurality of side columns, wallboard components, clamping fixing pieces and connecting pieces, the plurality of wallboard components are detachably connected between two adjacent side columns through the clamping fixing pieces, and the adjacent wallboard components are detachably connected through the connecting pieces. The construction method comprises the following steps: detachably fixing the clamping fixing piece and the side column; the wallboard components are detachably assembled between the two adjacent side columns through the clamping and fixing pieces; and the wallboards and the side columns are fixed in a spot welding mode to form the complete shear wall. According to the steel plate shear wall assembly and the construction method, the wallboard components can be conveniently positioned by arranging the clamping fixing pieces on the side columns, the end faces of the adjacent wallboard components can be kept flat through the connecting pieces, dependence on constructors is reduced, the cost is saved, and the construction efficiency is improved.
一种钢板剪力墙总成及施工方法,该钢板剪力墙总成包括若干侧柱、墙板构件、夹紧固定件及连接件,若干所述墙板构件通过所述夹紧固定件可拆卸连接在相邻的两个所述侧柱之间,且相邻的所述墙板构件之间通过连接件可拆卸连接,该施工方法包括如下步骤:将所述夹紧固定件与所述侧柱进行可拆卸固定;将所述墙板构件通过所述夹紧固定件可拆卸的装配在两相邻的所述侧柱之间;将墙板与侧柱之间进行点焊固定形成完整的剪力墙。该钢板剪力墙总成及施工方法,通过在侧柱上设置夹紧固定件,能够方便的对墙板构件进行定位,连接件还可以使得相邻的墙板构件的端面之间保持平整,减少对施工人员的依赖,节省了成本,提升了施工效率。
Steel plate shear wall assembly and construction method
钢板剪力墙总成及施工方法
ZHANG GUANZHONG (Autor:in) / WANG XIAOBING (Autor:in) / GONG BINBIN (Autor:in) / WANG MENG (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
Assembly integral type steel plate composite shear wall and assembly construction method
Europäisches Patentamt | 2024
|Hoisting body of steel plate shear wall and construction method of steel plate shear wall
Europäisches Patentamt | 2024
|Modularized assembly type steel plate encased concrete composite shear wall and construction method
Europäisches Patentamt | 2023
|