Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quick positioning device for upside-down hanging square steel column in reverse building method construction and construction method
The rapid positioning device comprises a square ring sleeve which is an opening type ring sleeve and used for being arranged on an upper square steel column in a sleeving mode, the square ring sleeve comprises a connecting part and an adjusting part, the connecting part and the upper square steel column are temporarily fixed, the adjusting part extends in the height direction of the upper square steel column, and the adjusting part is used for adjusting the height of the upper square steel column. A fixed distance l exists between the inner diameter of the adjusting part and the outer diameter of the upper square steel column; the cable pulling structure is connected with the square ring sleeve and used for pulling the square ring sleeve to slide up and down along the upper square steel column; the adjusting structure is arranged on the four side plates of the adjusting part and can move in the direction perpendicular to the adjusting part, before the square ring sleeve moves downwards, the tail end of the adjusting structure does not protrude out of the inner wall of the adjusting part, the bottom end of the square ring sleeve does not protrude out of the bottom end of the upper square steel column, and the adjusting structure is used for inwards extending by a fixed distance l after the square ring sleeve moves downwards. The square steel column calibration device has the effects of facilitating rapid calibration of the square steel column and improving the overall perpendicularity of the square steel column.
本申请涉及一种逆作法施工倒挂方钢柱快速定位装置及施工方法,其包括方形环套,为开口式环套且用于套设在上部方钢柱上,方形环套包括连接部以及调节部,连接部与上部方钢柱临时固定,调节部沿上部方钢柱的高度方向延伸,调节部内径与上部方钢柱外径之间存在固定距离l;牵索结构,与方形环套连接,用于牵引方形环套沿上部方钢柱上下滑动;调节结构,设置在调节部的四个侧板上,并可沿垂直于调节部的方向移动,方形环套下移前,所调节结构的末端不凸出于调节部的内壁,且方形环套的底端不凸出于上部方钢柱的底端,调节结构用于在方形环套下移后向内伸出固定距离l。本申请具有便于方钢柱快速校准,提高方钢柱整体的垂直度的效果。
Quick positioning device for upside-down hanging square steel column in reverse building method construction and construction method
The rapid positioning device comprises a square ring sleeve which is an opening type ring sleeve and used for being arranged on an upper square steel column in a sleeving mode, the square ring sleeve comprises a connecting part and an adjusting part, the connecting part and the upper square steel column are temporarily fixed, the adjusting part extends in the height direction of the upper square steel column, and the adjusting part is used for adjusting the height of the upper square steel column. A fixed distance l exists between the inner diameter of the adjusting part and the outer diameter of the upper square steel column; the cable pulling structure is connected with the square ring sleeve and used for pulling the square ring sleeve to slide up and down along the upper square steel column; the adjusting structure is arranged on the four side plates of the adjusting part and can move in the direction perpendicular to the adjusting part, before the square ring sleeve moves downwards, the tail end of the adjusting structure does not protrude out of the inner wall of the adjusting part, the bottom end of the square ring sleeve does not protrude out of the bottom end of the upper square steel column, and the adjusting structure is used for inwards extending by a fixed distance l after the square ring sleeve moves downwards. The square steel column calibration device has the effects of facilitating rapid calibration of the square steel column and improving the overall perpendicularity of the square steel column.
本申请涉及一种逆作法施工倒挂方钢柱快速定位装置及施工方法,其包括方形环套,为开口式环套且用于套设在上部方钢柱上,方形环套包括连接部以及调节部,连接部与上部方钢柱临时固定,调节部沿上部方钢柱的高度方向延伸,调节部内径与上部方钢柱外径之间存在固定距离l;牵索结构,与方形环套连接,用于牵引方形环套沿上部方钢柱上下滑动;调节结构,设置在调节部的四个侧板上,并可沿垂直于调节部的方向移动,方形环套下移前,所调节结构的末端不凸出于调节部的内壁,且方形环套的底端不凸出于上部方钢柱的底端,调节结构用于在方形环套下移后向内伸出固定距离l。本申请具有便于方钢柱快速校准,提高方钢柱整体的垂直度的效果。
Quick positioning device for upside-down hanging square steel column in reverse building method construction and construction method
一种逆作法施工倒挂方钢柱快速定位装置及施工方法
JANG JIN-HOON (Autor:in) / SONG YONGWEI (Autor:in) / YANG GUANG (Autor:in) / LIU LONG (Autor:in) / LIU QUANJUN (Autor:in) / AN DONG (Autor:in) / QI YI (Autor:in) / LIU MIN (Autor:in) / LIU XINJIA (Autor:in) / WANG ZHONGCHENG (Autor:in)
07.06.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Reverse construction method upside-down well construction process
Europäisches Patentamt | 2024
|Steel-concrete composite beam cast-in-place slab upside-down hanging construction method
Europäisches Patentamt | 2022
|Fabricated building overall upside-down construction system and construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|