Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated shear wall positioning and connecting device and connecting method
The invention discloses a fabricated shear wall positioning and connecting device and a connecting method. The fabricated shear wall positioning and connecting device comprises a positioning cone used for being pre-buried at the bottom of an upper-layer shear wall. The embedded plate is used for being embedded in the top of a lower-layer shear wall, and a connecting hole for allowing the front end of the positioning cone to be connected in an inserted mode is formed in the embedded plate; the locking mechanism is mounted on the embedded plate in an openable manner and is used for locking the positioning cone after the positioning cone is inserted into the connecting hole; the linkage mechanism can drive the locking mechanism to be closed in the process that the positioning cone is inserted into the connecting hole so as to lock the positioning cone, positioning connection between the upper shear wall and the lower shear wall is achieved, the positioning precision and the installation efficiency are improved, and high popularization value is achieved.
本发明公开了一种装配式剪力墙定位连接装置及连接方法,装配式剪力墙定位连接装置包括用于预埋在上层剪力墙底部的定位锥;用于预埋在下层剪力墙顶部的预埋板,所述预埋板上开设有供所述定位锥的前端插设连接的连接孔;可开合地安装于预埋板且用于在所述定位锥插入所述连接孔后锁定所述定位锥的锁定机构;以及可随着定位锥插设于连接孔的过程驱动锁定机构闭合,以实现对定位锥进行锁定的联动机构,本发明实现了上下两层剪力墙之间的定位连接,提高了定位精度和安装效率,具有较高的推广价值。
Fabricated shear wall positioning and connecting device and connecting method
The invention discloses a fabricated shear wall positioning and connecting device and a connecting method. The fabricated shear wall positioning and connecting device comprises a positioning cone used for being pre-buried at the bottom of an upper-layer shear wall. The embedded plate is used for being embedded in the top of a lower-layer shear wall, and a connecting hole for allowing the front end of the positioning cone to be connected in an inserted mode is formed in the embedded plate; the locking mechanism is mounted on the embedded plate in an openable manner and is used for locking the positioning cone after the positioning cone is inserted into the connecting hole; the linkage mechanism can drive the locking mechanism to be closed in the process that the positioning cone is inserted into the connecting hole so as to lock the positioning cone, positioning connection between the upper shear wall and the lower shear wall is achieved, the positioning precision and the installation efficiency are improved, and high popularization value is achieved.
本发明公开了一种装配式剪力墙定位连接装置及连接方法,装配式剪力墙定位连接装置包括用于预埋在上层剪力墙底部的定位锥;用于预埋在下层剪力墙顶部的预埋板,所述预埋板上开设有供所述定位锥的前端插设连接的连接孔;可开合地安装于预埋板且用于在所述定位锥插入所述连接孔后锁定所述定位锥的锁定机构;以及可随着定位锥插设于连接孔的过程驱动锁定机构闭合,以实现对定位锥进行锁定的联动机构,本发明实现了上下两层剪力墙之间的定位连接,提高了定位精度和安装效率,具有较高的推广价值。
Fabricated shear wall positioning and connecting device and connecting method
装配式剪力墙定位连接装置及连接方法
LI CHANG (Autor:in) / ZHANG SHIQIAN (Autor:in) / YANG XIAOCAO (Autor:in) / WEI SEN (Autor:in)
21.06.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated shear wall horizontal connecting device and method
Europäisches Patentamt | 2023
|