Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building scaffold and manufacturing method thereof
The invention discloses a building scaffold and a manufacturing method of the building scaffold, and relates to the field of building construction equipment. The device comprises a connecting plate, mounting rods are mounted at the opposite angles of the connecting plate, connecting rods are movably matched with the two ends of each mounting rod, a movable plate is movably matched among the four connecting rods, a telescopic plate is slidably matched with the interior of the movable plate, and a ladder is movably matched with one side of the connecting plate; the opposite sides of every two adjacent connecting rods are in sliding fit with cylinders, a rotating cylinder is rotationally matched between the two cylinders, inserting rods are arranged in the cylinders in a sliding fit mode, an adjusting assembly is arranged in the rotating cylinder, the adjusting assembly is matched with the two inserting rods, and the inserting rods are matched with the movable plates. By means of the rotating cylinder, the rotating cylinder can be connected with the two connecting rods, the two connecting rods can be connected together to be transported or assembled, and therefore the situation that the connecting rods are lost during transportation is reduced, and the connecting rods and the movable plate can be conveniently assembled and spliced during assembling.
本发明公开了一种建筑施工架及建筑施工架的制造方法,涉及建筑施工设备领域。本发明包括连接板,连接板的对角处均装设有安装杆,安装杆的两端均活动配合有连接杆,四个连接杆之间活动配合有一个活动板,活动板内滑动配合有伸缩板,连接板一侧活动配合有爬梯;两个相邻的连接杆相对侧均滑动配合有圆筒,两个圆筒之间转动配合有一个转动筒,圆筒内滑动配合有插杆,转动筒内装设有调节组件,调节组件与两个插杆相配合,插杆与活动板相配合。本发明通过设置的转动筒,能使转动筒连接两个连接杆,使两个连接杆能连接一起进行运输或组装,从而减少运输时连接杆出现丢失的情况,在组装时便于连接杆与活动板进行组装拼接。
Building scaffold and manufacturing method thereof
The invention discloses a building scaffold and a manufacturing method of the building scaffold, and relates to the field of building construction equipment. The device comprises a connecting plate, mounting rods are mounted at the opposite angles of the connecting plate, connecting rods are movably matched with the two ends of each mounting rod, a movable plate is movably matched among the four connecting rods, a telescopic plate is slidably matched with the interior of the movable plate, and a ladder is movably matched with one side of the connecting plate; the opposite sides of every two adjacent connecting rods are in sliding fit with cylinders, a rotating cylinder is rotationally matched between the two cylinders, inserting rods are arranged in the cylinders in a sliding fit mode, an adjusting assembly is arranged in the rotating cylinder, the adjusting assembly is matched with the two inserting rods, and the inserting rods are matched with the movable plates. By means of the rotating cylinder, the rotating cylinder can be connected with the two connecting rods, the two connecting rods can be connected together to be transported or assembled, and therefore the situation that the connecting rods are lost during transportation is reduced, and the connecting rods and the movable plate can be conveniently assembled and spliced during assembling.
本发明公开了一种建筑施工架及建筑施工架的制造方法,涉及建筑施工设备领域。本发明包括连接板,连接板的对角处均装设有安装杆,安装杆的两端均活动配合有连接杆,四个连接杆之间活动配合有一个活动板,活动板内滑动配合有伸缩板,连接板一侧活动配合有爬梯;两个相邻的连接杆相对侧均滑动配合有圆筒,两个圆筒之间转动配合有一个转动筒,圆筒内滑动配合有插杆,转动筒内装设有调节组件,调节组件与两个插杆相配合,插杆与活动板相配合。本发明通过设置的转动筒,能使转动筒连接两个连接杆,使两个连接杆能连接一起进行运输或组装,从而减少运输时连接杆出现丢失的情况,在组装时便于连接杆与活动板进行组装拼接。
Building scaffold and manufacturing method thereof
一种建筑施工架及建筑施工架的制造方法
LIAO XIANGBING (Autor:in) / ZHAO BIN (Autor:in) / SUN BO (Autor:in) / JIANG ZHUOYUE (Autor:in) / WANG TIANYU (Autor:in) / XU QINGCHUN (Autor:in) / FENG ZHUANG (Autor:in) / XU ZHENWEN (Autor:in) / ZHOU GONGMIN (Autor:in)
25.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building scaffold and manufacturing method of building scaffold
Europäisches Patentamt | 2021
|