Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Low-clearance diaphragm wall construction technology and gas lift reverse circulation equipment used in low-clearance diaphragm wall construction technology
The invention relates to the technical field of diaphragm wall construction, in particular to a low-clearance diaphragm wall construction technology and gas lift reverse circulation equipment used in the low-clearance diaphragm wall construction technology. The gas lift reverse circulation equipment comprises a track, a spraying guide pipe, a combined submersible drill, a grooving trolley and a winch; the winch and the grooving trolley are connected through welding and placed on the rail, the winch and the combined submersible drill are connected through a steel wire rope, the winch moves up and down to form holes in the combined submersible drill, and the combined submersible drill takes the spraying guide pipe as a guide slide way. The construction requirements of the low-clearance diaphragm wall are met by adopting a gas lift reverse circulation hole forming and multi-reinforcement cage translation mode.
本发明涉及地连墙施工技术领域,具体是一种低净空地连墙施工工艺和用于其中的气举反循环设备,气举反循环设备,包括轨道、喷导管、组合潜水钻、成槽台车、卷扬机;卷扬机与成槽台车通过焊接进行连接并放置在轨道上,卷扬机与组合潜水钻采用钢丝绳进行连接,卷扬机上下移动组合潜水钻成孔,组合潜水钻以喷导管为导向滑道。本申请采用气举反循环成孔,多幅钢筋笼平移方式,实现低净空地连墙施工要求。
Low-clearance diaphragm wall construction technology and gas lift reverse circulation equipment used in low-clearance diaphragm wall construction technology
The invention relates to the technical field of diaphragm wall construction, in particular to a low-clearance diaphragm wall construction technology and gas lift reverse circulation equipment used in the low-clearance diaphragm wall construction technology. The gas lift reverse circulation equipment comprises a track, a spraying guide pipe, a combined submersible drill, a grooving trolley and a winch; the winch and the grooving trolley are connected through welding and placed on the rail, the winch and the combined submersible drill are connected through a steel wire rope, the winch moves up and down to form holes in the combined submersible drill, and the combined submersible drill takes the spraying guide pipe as a guide slide way. The construction requirements of the low-clearance diaphragm wall are met by adopting a gas lift reverse circulation hole forming and multi-reinforcement cage translation mode.
本发明涉及地连墙施工技术领域,具体是一种低净空地连墙施工工艺和用于其中的气举反循环设备,气举反循环设备,包括轨道、喷导管、组合潜水钻、成槽台车、卷扬机;卷扬机与成槽台车通过焊接进行连接并放置在轨道上,卷扬机与组合潜水钻采用钢丝绳进行连接,卷扬机上下移动组合潜水钻成孔,组合潜水钻以喷导管为导向滑道。本申请采用气举反循环成孔,多幅钢筋笼平移方式,实现低净空地连墙施工要求。
Low-clearance diaphragm wall construction technology and gas lift reverse circulation equipment used in low-clearance diaphragm wall construction technology
一种低净空地连墙施工工艺和用于其中的气举反循环设备
NIE JINXING (Autor:in) / ZHANG PENG (Autor:in) / HOU YUXUE (Autor:in) / QI SHANMIN (Autor:in) / WEI SHANGPENG (Autor:in) / HAN WENJUN (Autor:in) / LI QINDA (Autor:in) / LUO JUNHAO (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Underground diaphragm wall construction method under low clearance condition
Europäisches Patentamt | 2022
|Equivalent diaphragm wall construction system and method used under low clearance condition
Europäisches Patentamt | 2021
|Construction method of underground diaphragm wall in low-clearance environment
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|