Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Diving transition section precast block throwing and filling construction method
The invention discloses a diving transition section precast block throwing and filling construction method, which relates to the technical field of precast block throwing and filling, and comprises the following steps: step 1, hardware preparation work before construction and concrete precast block manufacturing; 2, software preparation work before construction is carried out, measurement before construction is carried out, and a half-brick protective layer before throwing and filling of the precast blocks is measured; 3, test calculation is conducted, test data are counted through a test, and then the dumping and filling density is determined after the data are analyzed; fourthly, the prefabricated blocks are transferred and transported to a dumping and filling ship through transportation equipment; 5, positioning the precast block throwing and filling ship, and driving the throwing and filling ship to move through a traction ship for dragging the throwing and filling ship; sixthly, the precast blocks are thrown and filled, and precise throwing and filling are conducted through a throwing and filling device; 7, the throwing and filling effect is detected, specifically, the throwing and filling area of the precast block is detected, through the mode that swimming pool testing and field throwing and filling are combined, in the later period of construction, the filling frequency is reduced, the construction time is shortened, and the construction quality is improved.
本发明公开一种潜水过渡段预制块抛填施工方法,涉及预制块抛填技术领域,包括以下步骤:步骤一:施工前的硬件准备工作,混凝土预制块的制作;步骤二:施工前的软件准备工作,施工前测量,对预制块抛填前的半砖防护层进行测量;步骤三:试验计算,通过试验并统计试验数据,然后将数据分析后确定抛填密度;步骤四:转运预制块,通过运输设备运输至抛填船上;步骤五:预制块抛填船定位,通过牵引抛填船的牵引船带动抛填船运动;步骤六:预制块抛填,通过抛填装置进行精准抛填;步骤七:抛填效果检测,对预制块抛填区域进行检测,本发明通过泳池试验和现场抛填结合的方式,使得后期在施工内,减少补填的次数,减少施工时间,增加施工质量。
Diving transition section precast block throwing and filling construction method
The invention discloses a diving transition section precast block throwing and filling construction method, which relates to the technical field of precast block throwing and filling, and comprises the following steps: step 1, hardware preparation work before construction and concrete precast block manufacturing; 2, software preparation work before construction is carried out, measurement before construction is carried out, and a half-brick protective layer before throwing and filling of the precast blocks is measured; 3, test calculation is conducted, test data are counted through a test, and then the dumping and filling density is determined after the data are analyzed; fourthly, the prefabricated blocks are transferred and transported to a dumping and filling ship through transportation equipment; 5, positioning the precast block throwing and filling ship, and driving the throwing and filling ship to move through a traction ship for dragging the throwing and filling ship; sixthly, the precast blocks are thrown and filled, and precise throwing and filling are conducted through a throwing and filling device; 7, the throwing and filling effect is detected, specifically, the throwing and filling area of the precast block is detected, through the mode that swimming pool testing and field throwing and filling are combined, in the later period of construction, the filling frequency is reduced, the construction time is shortened, and the construction quality is improved.
本发明公开一种潜水过渡段预制块抛填施工方法,涉及预制块抛填技术领域,包括以下步骤:步骤一:施工前的硬件准备工作,混凝土预制块的制作;步骤二:施工前的软件准备工作,施工前测量,对预制块抛填前的半砖防护层进行测量;步骤三:试验计算,通过试验并统计试验数据,然后将数据分析后确定抛填密度;步骤四:转运预制块,通过运输设备运输至抛填船上;步骤五:预制块抛填船定位,通过牵引抛填船的牵引船带动抛填船运动;步骤六:预制块抛填,通过抛填装置进行精准抛填;步骤七:抛填效果检测,对预制块抛填区域进行检测,本发明通过泳池试验和现场抛填结合的方式,使得后期在施工内,减少补填的次数,减少施工时间,增加施工质量。
Diving transition section precast block throwing and filling construction method
一种潜水过渡段预制块抛填施工方法
KONG CHUNYAN (Autor:in)
16.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
B63B
Schiffe oder sonstige Wasserfahrzeuge
,
SHIPS OR OTHER WATERBORNE VESSELS
/
E02D
FOUNDATIONS
,
Gründungen
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
River bank protection precast block supplementary throwing device and supplementary throwing method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Airtight earthwork throwing and filling construction process
Europäisches Patentamt | 2021
|Simulation test method for rock block throwing and filling
Europäisches Patentamt | 2024
|Concrete precast block rapid throw-filling structure and throw-filling method
Europäisches Patentamt | 2021
|