Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Corridor structure and construction technology thereof
The invention discloses a corridor structure and a construction technology thereof, and relates to the technical field of corridors. In order to ensure the stability of the corridor during installation, the corridor structure comprises a corridor main body installed on a wall body through an installation part, an inlet hole is formed in the surface of the wall body, and the installation part comprises an installation column fixed to the outer wall of one side of the corridor main body; the construction technology of the corridor structure comprises the following steps that the mounting columns and the corridor body are fixedly connected. The rotating shell rotates relative to the mounting column, so that the mounting column and the rotating shell are limited in the transverse direction through the first anti-disengaging plate and the second anti-disengaging plate, the rotating plate is lifted through a lifting hook of lifting equipment by forming a notch in the rotating plate, and the lifting efficiency of the lifting equipment is improved. The corridor main body is moved to the hoisting height through the mounting part and the hoisting equipment to be hoisted, the mounting part and the corridor main body are detachably arranged, so that the mounting part can be recycled, and the mounting cost is reduced.
本发明公开了一种连廊结构及其施工工艺,涉及连廊技术领域。为了保证连廊安装时的稳定性,该连廊结构包括利用安装部安装在墙体上的连廊主体,且墙体表面开设有进入孔,所述安装部包括:安装柱:其固定于连廊主体一侧外壁;该连廊结构的施工工艺,包括以下步骤:将安装柱和连廊主体之间固定连接。本发明利用转动壳相对于安装柱的转动,使得防脱板一和防脱板二对安装柱和转动壳之间在横向上进行限位,通过在旋转板上设置豁口,使得起吊设备的吊钩可以对旋转板进行起吊,从而将连廊主体利用安装部和起吊设备移动至吊装高度进行吊装,通过将安装部和连廊主体之间设置为拆卸式,从而可以实现对于安装部的循环使用,降低安装成本。
Corridor structure and construction technology thereof
The invention discloses a corridor structure and a construction technology thereof, and relates to the technical field of corridors. In order to ensure the stability of the corridor during installation, the corridor structure comprises a corridor main body installed on a wall body through an installation part, an inlet hole is formed in the surface of the wall body, and the installation part comprises an installation column fixed to the outer wall of one side of the corridor main body; the construction technology of the corridor structure comprises the following steps that the mounting columns and the corridor body are fixedly connected. The rotating shell rotates relative to the mounting column, so that the mounting column and the rotating shell are limited in the transverse direction through the first anti-disengaging plate and the second anti-disengaging plate, the rotating plate is lifted through a lifting hook of lifting equipment by forming a notch in the rotating plate, and the lifting efficiency of the lifting equipment is improved. The corridor main body is moved to the hoisting height through the mounting part and the hoisting equipment to be hoisted, the mounting part and the corridor main body are detachably arranged, so that the mounting part can be recycled, and the mounting cost is reduced.
本发明公开了一种连廊结构及其施工工艺,涉及连廊技术领域。为了保证连廊安装时的稳定性,该连廊结构包括利用安装部安装在墙体上的连廊主体,且墙体表面开设有进入孔,所述安装部包括:安装柱:其固定于连廊主体一侧外壁;该连廊结构的施工工艺,包括以下步骤:将安装柱和连廊主体之间固定连接。本发明利用转动壳相对于安装柱的转动,使得防脱板一和防脱板二对安装柱和转动壳之间在横向上进行限位,通过在旋转板上设置豁口,使得起吊设备的吊钩可以对旋转板进行起吊,从而将连廊主体利用安装部和起吊设备移动至吊装高度进行吊装,通过将安装部和连廊主体之间设置为拆卸式,从而可以实现对于安装部的循环使用,降低安装成本。
Corridor structure and construction technology thereof
一种连廊结构及其施工工艺
GUO ZHILIANG (Autor:in) / WANG RONG (Autor:in) / ZHU GANG (Autor:in) / REN GUANGQIANG (Autor:in) / GUO LEI (Autor:in) / FAN DANLAN (Autor:in) / LI MANZHEN (Autor:in) / JIANG GUOPING (Autor:in)
13.08.2024
Patent
Elektronische Ressource
Chinesisch
Corridor shed steel structure and construction technology
Europäisches Patentamt | 2020
|Ecological corridor structure and construction method thereof
Europäisches Patentamt | 2023
|Steel structure corridor support and construction method thereof
Europäisches Patentamt | 2024
|Steel structure landscape corridor and construction method thereof
Europäisches Patentamt | 2022
|Hospital air corridor structure and construction method thereof
Europäisches Patentamt | 2024
|