Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hospital air corridor structure and construction method thereof
The invention relates to the technical field of corridors, and discloses a hospital air corridor structure which comprises two corridor bodies, the ends, away from each other, of the two corridor bodies are hinged to two buildings respectively, and the ends, opposite to each other, of the two corridor bodies abut against each other; the fixing pieces are detachably connected with the opposite ends of the two corridor bodies correspondingly; the corridor body comprises a first bottom plate and a second bottom plate, the first bottom plate and the second bottom plate are hinged through a hinge shaft, first side fences are arranged on the two sides of the first bottom plate, second side fences are arranged on the two sides of the second bottom plate, and the bottom of the first side fence and the bottom of the second side fence located on the same side are hinged to the hinge shaft. The top of the second side fence and the top of the second side fence which are located on the same side are separated through a middle piece. The top, close to the first side fence, of the second side fence is connected with the building through an inclined main inhaul cable, a winding mechanism for winding the main inhaul cable is arranged on the building, and flexibility and safety are achieved.
本发明涉及连廊技术领域,公开了一种医院空中连廊结构,包括:两个连廊本体,两个连廊本体相背离的一端分别与两栋建筑铰接,两个连廊本体相向的一端止抵;固定件,固定件分别与两个连廊本体相向的一端可拆卸地连接;连廊本体包括第一底板和第二底板,第一底板和第二底板通过铰接轴铰接,第一底板的两侧均设有第一侧边围栏,第二底板的两侧均设有第二侧边围栏,位于同一侧的第一侧边围栏的底部和第二侧边围栏的底部均与铰接轴铰接,位于同一侧的第二侧边围栏的顶部和第二侧边围栏的顶部通过中间件间隔开;第二侧边围栏靠近第一侧边围栏的顶部与建筑物通过倾斜的主拉索连接,建筑物上设有收卷主拉索的收卷机构,具有灵活性、安全性。
Hospital air corridor structure and construction method thereof
The invention relates to the technical field of corridors, and discloses a hospital air corridor structure which comprises two corridor bodies, the ends, away from each other, of the two corridor bodies are hinged to two buildings respectively, and the ends, opposite to each other, of the two corridor bodies abut against each other; the fixing pieces are detachably connected with the opposite ends of the two corridor bodies correspondingly; the corridor body comprises a first bottom plate and a second bottom plate, the first bottom plate and the second bottom plate are hinged through a hinge shaft, first side fences are arranged on the two sides of the first bottom plate, second side fences are arranged on the two sides of the second bottom plate, and the bottom of the first side fence and the bottom of the second side fence located on the same side are hinged to the hinge shaft. The top of the second side fence and the top of the second side fence which are located on the same side are separated through a middle piece. The top, close to the first side fence, of the second side fence is connected with the building through an inclined main inhaul cable, a winding mechanism for winding the main inhaul cable is arranged on the building, and flexibility and safety are achieved.
本发明涉及连廊技术领域,公开了一种医院空中连廊结构,包括:两个连廊本体,两个连廊本体相背离的一端分别与两栋建筑铰接,两个连廊本体相向的一端止抵;固定件,固定件分别与两个连廊本体相向的一端可拆卸地连接;连廊本体包括第一底板和第二底板,第一底板和第二底板通过铰接轴铰接,第一底板的两侧均设有第一侧边围栏,第二底板的两侧均设有第二侧边围栏,位于同一侧的第一侧边围栏的底部和第二侧边围栏的底部均与铰接轴铰接,位于同一侧的第二侧边围栏的顶部和第二侧边围栏的顶部通过中间件间隔开;第二侧边围栏靠近第一侧边围栏的顶部与建筑物通过倾斜的主拉索连接,建筑物上设有收卷主拉索的收卷机构,具有灵活性、安全性。
Hospital air corridor structure and construction method thereof
一种医院空中连廊结构及其施工方法
XIONG WEI (Autor:in) / CHEN HONGFEI (Autor:in) / CHEN GANG (Autor:in) / YANG RONGKUAN (Autor:in) / LI WENCHAO (Autor:in) / ZHOU WEIGANG (Autor:in) / JIANG XINGWEI (Autor:in) / MENG XIANGYI (Autor:in) / WANG ZHIWEI (Autor:in)
15.11.2024
Patent
Elektronische Ressource
Chinesisch
Ecological corridor structure and construction method thereof
Europäisches Patentamt | 2023
|Corridor structure and construction technology thereof
Europäisches Patentamt | 2024
|Steel structure corridor support and construction method thereof
Europäisches Patentamt | 2024
|Steel structure landscape corridor and construction method thereof
Europäisches Patentamt | 2022
|Fabricated corridor, corridor end connecting structure and construction method
Europäisches Patentamt | 2023
|