Bridge closure construction method and bridge
The invention discloses a bridge closure construction method and a bridge. The method comprises the following steps that S1, two first reinforcing meshes arranged in a spaced mode are erected, and anchoring assemblies are fixedly installed on the two first reinforcing meshes; s2, two cast-in-place beams arranged in a spaced mode are formed through formwork pouring; s3, the connecting assembly is hoisted between the two aligned anchoring assemblies, and the connecting assembly is temporarily supported on the anchoring assemblies through the butt joint assemblies; s4, connecting and fixing the connecting assembly and the anchoring assembly; and S5, a second reinforcing mesh is erected between the two cast-in-place beams, and a closure beam section is formed through formwork pouring. Connection with the anchoring assemblies of the cast-in-place beams on the two sides is achieved only through the connecting assemblies, construction is simplified, the connecting assemblies can be temporarily supported on the anchoring assemblies through the butt joint assemblies when the connecting assemblies are installed, the temporary supporting problem in the construction process is reduced, a supporting frame does not need to be additionally erected to support the connecting assemblies for auxiliary construction, and the construction efficiency is improved. The construction is simpler and more convenient.
本发明公开了一种桥梁合拢施工方法及桥梁,方法包括如下步骤:S1、架设两个间隔设置的第一钢筋网,并在两个第一钢筋网上均固定安装锚固组件;S2、通过模板浇筑形成两个间隔设置的现浇梁;S3、将连接组件吊装于两个对齐的锚固组件中间,并利用对接组件将连接组件临时支撑在锚固组件上;S4、将连接组件与锚固组件连接固定;S5、在两个现浇梁中间架设第二钢筋网,通过模板浇筑形成合拢梁段。本发明仅需要连接组件就实现与两侧的现浇梁的锚固组件连接,简化施工,且连接组件安装时还能利用对接组件将连接组件临时支撑在锚固组件上,减少施工过程中的临时支撑问题,不需要额外架设支撑架来支撑连接组件进行辅助施工,施工更加简单方便。
Bridge closure construction method and bridge
The invention discloses a bridge closure construction method and a bridge. The method comprises the following steps that S1, two first reinforcing meshes arranged in a spaced mode are erected, and anchoring assemblies are fixedly installed on the two first reinforcing meshes; s2, two cast-in-place beams arranged in a spaced mode are formed through formwork pouring; s3, the connecting assembly is hoisted between the two aligned anchoring assemblies, and the connecting assembly is temporarily supported on the anchoring assemblies through the butt joint assemblies; s4, connecting and fixing the connecting assembly and the anchoring assembly; and S5, a second reinforcing mesh is erected between the two cast-in-place beams, and a closure beam section is formed through formwork pouring. Connection with the anchoring assemblies of the cast-in-place beams on the two sides is achieved only through the connecting assemblies, construction is simplified, the connecting assemblies can be temporarily supported on the anchoring assemblies through the butt joint assemblies when the connecting assemblies are installed, the temporary supporting problem in the construction process is reduced, a supporting frame does not need to be additionally erected to support the connecting assemblies for auxiliary construction, and the construction efficiency is improved. The construction is simpler and more convenient.
本发明公开了一种桥梁合拢施工方法及桥梁,方法包括如下步骤:S1、架设两个间隔设置的第一钢筋网,并在两个第一钢筋网上均固定安装锚固组件;S2、通过模板浇筑形成两个间隔设置的现浇梁;S3、将连接组件吊装于两个对齐的锚固组件中间,并利用对接组件将连接组件临时支撑在锚固组件上;S4、将连接组件与锚固组件连接固定;S5、在两个现浇梁中间架设第二钢筋网,通过模板浇筑形成合拢梁段。本发明仅需要连接组件就实现与两侧的现浇梁的锚固组件连接,简化施工,且连接组件安装时还能利用对接组件将连接组件临时支撑在锚固组件上,减少施工过程中的临时支撑问题,不需要额外架设支撑架来支撑连接组件进行辅助施工,施工更加简单方便。
Bridge closure construction method and bridge
一种桥梁合拢施工方法及桥梁
LI YULIN (Autor:in) / ZHAO WEI (Autor:in) / ZHANG XIAOLONG (Autor:in) / HE JUNPING (Autor:in) / TAN HONGPING (Autor:in) / CHEN JIANMIN (Autor:in) / FENG BIN (Autor:in) / LIU DONGHAI (Autor:in) / YUAN FEI (Autor:in) / PENG YU (Autor:in)
16.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Swivel bridge closure device and swivel bridge closure construction method
Europäisches Patentamt | 2020
|