Equipment foundation bolt pre-burying method based on BIM and GIS technologies
The invention relates to the technical field of equipment civil engineering foundation construction, in particular to an equipment foundation bolt pre-embedding method based on BIM and GIS technologies, and the method comprises the steps: downloading actual data information, generated by the GIS technology, of the landform of a construction site, and carrying out the building of a construction content model through the BIM technology; the GIS export site model and the BIM model are subjected to fitting deviation correction by means of Navisworks software, and then are converted into coordinate information by using the GIS system, and the coordinate information is imported into a positioning robot, so that a GIS positioning robot positioning system is formed; the embedded bolts are fixed through a fixing anchor frame, and positioning and mounting are conducted through a GIS positioning robot; and after the GIS positioning robot is positioned and installed, grouting is conducted through a grouting system, the fixed anchor frame is removed after grouting is completed, and setting of the embedded foundation bolts is completed. The installation and arrangement precision of the embedded foundation bolt is greatly improved, the construction cost and the rework rate are reduced, and the construction period is shortened.
本发明涉及设备土建基础施工技术领域,尤其涉及一种基于BIM和GIS技术的设备基础螺栓预埋方法,下载由GIS技术生成的施工场地地形地貌的实际数据信息,使用BIM技术进行施工内容的模型建立;将GIS系统导出场地模型与BIM模型借助Navisworks软件进行拟合纠偏后,使用GIS系统转换成坐标信息导入定位机器人中,组成GIS定位机器人定位系统;利用固定锚框固定预埋螺栓,利用GIS定位机器人定位安装;GIS定位机器人定位安装后,利用灌浆系统灌浆,灌浆完成后拆掉固定锚框,完成预埋地脚螺栓的设置。本发明大幅度增加了预埋地脚螺栓的安装设置精度,降低了施工成本和返工率,缩短了施工工期。
Equipment foundation bolt pre-burying method based on BIM and GIS technologies
The invention relates to the technical field of equipment civil engineering foundation construction, in particular to an equipment foundation bolt pre-embedding method based on BIM and GIS technologies, and the method comprises the steps: downloading actual data information, generated by the GIS technology, of the landform of a construction site, and carrying out the building of a construction content model through the BIM technology; the GIS export site model and the BIM model are subjected to fitting deviation correction by means of Navisworks software, and then are converted into coordinate information by using the GIS system, and the coordinate information is imported into a positioning robot, so that a GIS positioning robot positioning system is formed; the embedded bolts are fixed through a fixing anchor frame, and positioning and mounting are conducted through a GIS positioning robot; and after the GIS positioning robot is positioned and installed, grouting is conducted through a grouting system, the fixed anchor frame is removed after grouting is completed, and setting of the embedded foundation bolts is completed. The installation and arrangement precision of the embedded foundation bolt is greatly improved, the construction cost and the rework rate are reduced, and the construction period is shortened.
本发明涉及设备土建基础施工技术领域,尤其涉及一种基于BIM和GIS技术的设备基础螺栓预埋方法,下载由GIS技术生成的施工场地地形地貌的实际数据信息,使用BIM技术进行施工内容的模型建立;将GIS系统导出场地模型与BIM模型借助Navisworks软件进行拟合纠偏后,使用GIS系统转换成坐标信息导入定位机器人中,组成GIS定位机器人定位系统;利用固定锚框固定预埋螺栓,利用GIS定位机器人定位安装;GIS定位机器人定位安装后,利用灌浆系统灌浆,灌浆完成后拆掉固定锚框,完成预埋地脚螺栓的设置。本发明大幅度增加了预埋地脚螺栓的安装设置精度,降低了施工成本和返工率,缩短了施工工期。
Equipment foundation bolt pre-burying method based on BIM and GIS technologies
基于BIM和GIS技术的设备基础螺栓预埋方法
WU PENG (Autor:in) / QIU RUI (Autor:in) / FENG MINGJIA (Autor:in) / YAO BIN (Autor:in) / CAO GUOHUI (Autor:in) / SUN HAI (Autor:in) / WEI XUEFEI (Autor:in)
27.08.2024
Patent
Elektronische Ressource
Chinesisch
Integral pre-burying device for foundation bolt of large tower
Europäisches Patentamt | 2024
|Concrete foundation pile structure and burying method
Europäisches Patentamt | 2024
|