Light overhanging double-column type bridge structure and erecting device
The invention belongs to the technical field of bridge construction, and particularly relates to a light overhanging double-column type bridge structure and an erecting device.The bridge structure comprises a first rectangular frame, a second sliding rail is fixedly connected to the upper end of the interior of the first rectangular frame, a first sliding table is slidably arranged at the lower end of the second sliding rail, and a second sliding table is fixedly connected to the lower end of the first sliding table; a third sliding rail is slidably arranged at the lower end of the second sliding table, supporting assemblies are arranged on the two sides of the lower end of the third sliding rail correspondingly, each supporting assembly comprises a fourth sliding table slidably arranged at the lower end of the third sliding rail, and the lower end of each fourth sliding table is fixedly connected with the output end of a first hydraulic rod; a sixth sliding table is driven to drive a clamping block of a clamping assembly to move towards one side, a beam plate is clamped and moved to the upper ends of two cover beams, and then the beam plate can be placed at the upper ends of the two cover beams, so that the problems that in the prior art, a crane needs to be used for hoisting the beam plate during hoisting, the occupied space of the crane is large, and erecting can be completed only by pushing the beam plate after transferring, and the construction cost is high are solved. And the above problems are solved.
本发明属于桥梁建设技术领域,具体的说是一种轻型化悬挑双柱式桥梁结构及架设装置,桥梁结构包括第一矩形框,所述第一矩形框内部上端固接有第二滑轨,所述第二滑轨下端滑动设置有第一滑台,所述第一滑台下端固接有第二滑台,所述第二滑台下端滑动设置有第三滑轨,所述第三滑轨下端两侧分别设有支撑组件,所述支撑组件包括第三滑轨下端滑动设置的第四滑台,所述第四滑台下端固接有第一液压杆的输出端,通过驱动第六滑台带动夹持组件的夹持块向一侧移动,对梁板进行夹持并移动至两个盖梁上端,即可将梁板放置在两个盖梁上端,解决了现有技术中,吊装时需要使用吊机将梁板吊起,吊机占用空间较大,转移后再进行顶推,才可完成架设,较为繁琐的问题。
Light overhanging double-column type bridge structure and erecting device
The invention belongs to the technical field of bridge construction, and particularly relates to a light overhanging double-column type bridge structure and an erecting device.The bridge structure comprises a first rectangular frame, a second sliding rail is fixedly connected to the upper end of the interior of the first rectangular frame, a first sliding table is slidably arranged at the lower end of the second sliding rail, and a second sliding table is fixedly connected to the lower end of the first sliding table; a third sliding rail is slidably arranged at the lower end of the second sliding table, supporting assemblies are arranged on the two sides of the lower end of the third sliding rail correspondingly, each supporting assembly comprises a fourth sliding table slidably arranged at the lower end of the third sliding rail, and the lower end of each fourth sliding table is fixedly connected with the output end of a first hydraulic rod; a sixth sliding table is driven to drive a clamping block of a clamping assembly to move towards one side, a beam plate is clamped and moved to the upper ends of two cover beams, and then the beam plate can be placed at the upper ends of the two cover beams, so that the problems that in the prior art, a crane needs to be used for hoisting the beam plate during hoisting, the occupied space of the crane is large, and erecting can be completed only by pushing the beam plate after transferring, and the construction cost is high are solved. And the above problems are solved.
本发明属于桥梁建设技术领域,具体的说是一种轻型化悬挑双柱式桥梁结构及架设装置,桥梁结构包括第一矩形框,所述第一矩形框内部上端固接有第二滑轨,所述第二滑轨下端滑动设置有第一滑台,所述第一滑台下端固接有第二滑台,所述第二滑台下端滑动设置有第三滑轨,所述第三滑轨下端两侧分别设有支撑组件,所述支撑组件包括第三滑轨下端滑动设置的第四滑台,所述第四滑台下端固接有第一液压杆的输出端,通过驱动第六滑台带动夹持组件的夹持块向一侧移动,对梁板进行夹持并移动至两个盖梁上端,即可将梁板放置在两个盖梁上端,解决了现有技术中,吊装时需要使用吊机将梁板吊起,吊机占用空间较大,转移后再进行顶推,才可完成架设,较为繁琐的问题。
Light overhanging double-column type bridge structure and erecting device
一种轻型化悬挑双柱式桥梁结构及架设装置
LI JIANHUA (Autor:in) / XU SHIQIN (Autor:in) / WANG SONG (Autor:in) / XIAO JING (Autor:in) / LIU FENGCHAO (Autor:in) / WANG SEN (Autor:in) / JIAO SHIPENG (Autor:in) / LI XIN (Autor:in) / GAO PENGLIANG (Autor:in) / ZHAO YUNTIAN (Autor:in)
30.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Overhanging scaffold erecting and dismantling process
Europäisches Patentamt | 2024
|Auxiliary positioning tool for erecting overhanging type steel pipe scaffold
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Formwork erecting method for plate buckle frame at overhanging position
Europäisches Patentamt | 2024
|