Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Transverse moving amplitude passing method of bridge girder erection machine
The invention discloses a bridge construction device, and aims to provide a transverse movement amplitude crossing method of a bridge girder erection machine, which is safe, reliable, short in amplitude crossing time and low in cost, and is characterized in that the main body structure of the bridge girder erection machine is a multi-section truss connecting beam, is easy to disassemble and assemble, is convenient to transfer on a construction site, transversely moves in place at one time, and is high in wind resistance; compared with a traditional bridging machine amplitude passing operation, the transverse moving amplitude passing scheme of the bridging machine is short in consumed time, low in needed cost and high in transverse moving efficiency, the beam erecting efficiency is improved by adopting the transverse moving amplitude passing scheme of the bridging machine, compared with a traditional amplitude passing method, the bridging machine does not need to be hoisted to get off a bridge any more, the number of times of dismounting and mounting of equipment is reduced, and the construction cost is reduced. The method has the advantages that the safety control risk is reduced, meanwhile, the site requirement is low, the problems of foundation reinforcement and limited site occupation due to insufficient foundation bearing capacity are solved, the engineering cost is reduced, the operation procedure is simplified, the working efficiency is greatly improved, and the method is suitable for the technical field of bridge construction.
本发明公开了一种桥梁建设装置,旨在提供一种安全可靠,过幅时间短,并且费用较少的架桥机的横移过幅方法,其技术方案要点是架桥机主体结构为多段桁架联接梁,易于拆装、便于施工现场转移,边横移一次到位,抗风能力大,能够确保安全作业,与传统架桥机过幅作业相比,耗费的时间短,需要的费用少,横移的效率高,且采用上述的架桥机横移过幅方案,提高了架梁的效率,与传统的过幅方法相比,不再吊运架桥机下桥,减少了设备的拆装次数,降低了安全管控的风险,同时对场地的要求低,避免了因地基承载力不足而进行地基加固、占用有限场地的问题,降低了工程成本,并且简化了作业程序,大幅提高了工作的效率,本发明适用于桥梁建设技术领域。
Transverse moving amplitude passing method of bridge girder erection machine
The invention discloses a bridge construction device, and aims to provide a transverse movement amplitude crossing method of a bridge girder erection machine, which is safe, reliable, short in amplitude crossing time and low in cost, and is characterized in that the main body structure of the bridge girder erection machine is a multi-section truss connecting beam, is easy to disassemble and assemble, is convenient to transfer on a construction site, transversely moves in place at one time, and is high in wind resistance; compared with a traditional bridging machine amplitude passing operation, the transverse moving amplitude passing scheme of the bridging machine is short in consumed time, low in needed cost and high in transverse moving efficiency, the beam erecting efficiency is improved by adopting the transverse moving amplitude passing scheme of the bridging machine, compared with a traditional amplitude passing method, the bridging machine does not need to be hoisted to get off a bridge any more, the number of times of dismounting and mounting of equipment is reduced, and the construction cost is reduced. The method has the advantages that the safety control risk is reduced, meanwhile, the site requirement is low, the problems of foundation reinforcement and limited site occupation due to insufficient foundation bearing capacity are solved, the engineering cost is reduced, the operation procedure is simplified, the working efficiency is greatly improved, and the method is suitable for the technical field of bridge construction.
本发明公开了一种桥梁建设装置,旨在提供一种安全可靠,过幅时间短,并且费用较少的架桥机的横移过幅方法,其技术方案要点是架桥机主体结构为多段桁架联接梁,易于拆装、便于施工现场转移,边横移一次到位,抗风能力大,能够确保安全作业,与传统架桥机过幅作业相比,耗费的时间短,需要的费用少,横移的效率高,且采用上述的架桥机横移过幅方案,提高了架梁的效率,与传统的过幅方法相比,不再吊运架桥机下桥,减少了设备的拆装次数,降低了安全管控的风险,同时对场地的要求低,避免了因地基承载力不足而进行地基加固、占用有限场地的问题,降低了工程成本,并且简化了作业程序,大幅提高了工作的效率,本发明适用于桥梁建设技术领域。
Transverse moving amplitude passing method of bridge girder erection machine
一种架桥机的横移过幅方法
WU GANG (Autor:in) / SUN JIE (Autor:in) / XU ZHENDONG (Autor:in) / SONG WANGYI (Autor:in)
03.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge girder erection machine and girder erection and hole passing method thereof
Europäisches Patentamt | 2023
|Automatic transverse moving system and transverse moving method of bridge girder erection machine
Europäisches Patentamt | 2023
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
Europäisches Patentamt | 2024
|Transverse bridge girder erection machine and use method
Europäisches Patentamt | 2022
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
Europäisches Patentamt | 2024
|