Offshore pile structure and construction method thereof
The invention discloses an offshore pile structure and a construction method thereof.The offshore pile structure comprises a plurality of PHC piles arranged at intervals and a pile top platform connected to the tops of the PHC piles, a first supporting structure is further connected between every two adjacent PHC piles, the first supporting structures are arranged in an X shape, and each first supporting structure comprises four first inclined struts and a connecting plate; one end of each first inclined strut is in bolted connection with the PHC pile through a hoop, the other end of each first inclined strut is in bolted connection with the connecting plate, the hoops comprise the first hoop and the second hoop, the first hoop is arranged above the water surface, and the second hoop is arranged below the water surface. The connecting plate used for connecting the four first inclined struts is arranged, the length of the first inclined struts can be shortened by half, the construction difficulty is lowered, and the construction precision is improved; the first hoop is arranged above the water surface, the first hoop can be conveniently installed and adjusted through the floating mat, and therefore connection between the first supporting structure and the PHC pile can be conveniently achieved, the problem that underwater adjustment is difficult is solved, and the underwater operation workload is greatly reduced.
本发明公开了一种海上桩结构及其施工方法,海上桩结构包括若干个间隔设置的PHC桩和连接于PHC桩顶部的桩顶平台,相邻两个PHC桩之间还连接有第一支撑结构,第一支撑结构呈X形布置,第一支撑结构包括4根第一斜撑和连接板,每根第一斜撑的一端与PHC桩通过抱箍进行螺栓连接,另一端与连接板螺栓连接,抱箍包括第一抱箍和第二抱箍,第一抱箍设置于水面以上,第二抱箍设置于水面以下。本发明设置了用于连接4根第一斜撑的连接板,能够将第一斜撑的长度缩短一半,降低施工难度,提高施工精度;将第一抱箍设置于水面以上,便于通过浮排安装并调整第一抱箍,从而便于实现第一支撑结构和PHC桩之间的连接,解决了水下调整困难的问题,大大减少了水下作业工作量。
Offshore pile structure and construction method thereof
The invention discloses an offshore pile structure and a construction method thereof.The offshore pile structure comprises a plurality of PHC piles arranged at intervals and a pile top platform connected to the tops of the PHC piles, a first supporting structure is further connected between every two adjacent PHC piles, the first supporting structures are arranged in an X shape, and each first supporting structure comprises four first inclined struts and a connecting plate; one end of each first inclined strut is in bolted connection with the PHC pile through a hoop, the other end of each first inclined strut is in bolted connection with the connecting plate, the hoops comprise the first hoop and the second hoop, the first hoop is arranged above the water surface, and the second hoop is arranged below the water surface. The connecting plate used for connecting the four first inclined struts is arranged, the length of the first inclined struts can be shortened by half, the construction difficulty is lowered, and the construction precision is improved; the first hoop is arranged above the water surface, the first hoop can be conveniently installed and adjusted through the floating mat, and therefore connection between the first supporting structure and the PHC pile can be conveniently achieved, the problem that underwater adjustment is difficult is solved, and the underwater operation workload is greatly reduced.
本发明公开了一种海上桩结构及其施工方法,海上桩结构包括若干个间隔设置的PHC桩和连接于PHC桩顶部的桩顶平台,相邻两个PHC桩之间还连接有第一支撑结构,第一支撑结构呈X形布置,第一支撑结构包括4根第一斜撑和连接板,每根第一斜撑的一端与PHC桩通过抱箍进行螺栓连接,另一端与连接板螺栓连接,抱箍包括第一抱箍和第二抱箍,第一抱箍设置于水面以上,第二抱箍设置于水面以下。本发明设置了用于连接4根第一斜撑的连接板,能够将第一斜撑的长度缩短一半,降低施工难度,提高施工精度;将第一抱箍设置于水面以上,便于通过浮排安装并调整第一抱箍,从而便于实现第一支撑结构和PHC桩之间的连接,解决了水下调整困难的问题,大大减少了水下作业工作量。
Offshore pile structure and construction method thereof
一种海上桩结构及其施工方法
YANG ZHIYUAN (Autor:in) / XU JIE (Autor:in) / XIE XIANJU (Autor:in) / LI WEIWEI (Autor:in) / XU CHAO (Autor:in) / DONG CHUAN (Autor:in) / XIE SHOUPENG (Autor:in) / GAO WEI (Autor:in) / TAO LIMING (Autor:in) / HAN XIANG (Autor:in)
10.09.2024
Patent
Elektronische Ressource
Chinesisch
Offshore composite structure single pile and construction method thereof
Europäisches Patentamt | 2024
|Offshore construction sand pile and construction method thereof
Europäisches Patentamt | 2022
|PILE CONSTRUCTION METHOD FOR SUPPORTING OFFSHORE STRUCTURE
Europäisches Patentamt | 2016
|Offshore single pile foundation and construction method thereof
Europäisches Patentamt | 2024
|Offshore wind power single pile foundation structure and construction method thereof
Europäisches Patentamt | 2024
|