Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for improving installation precision of steel column
The invention discloses a construction method for improving the installation precision of a steel column, which comprises the following steps of: accurately measuring and marking a site, ensuring that a foundation or a foundation is accurately measured and marked before the steel column is installed, and presetting mark points or mark lines on the steel column and an embedded part of the foundation so as to ensure the positioning accuracy during installation. Marking and distinguishing are facilitated by conducting specific protrusion or color on the marks, and then workers can be assisted in accurately positioning and adjusting the position of the steel column; according to the laser measurement technology, a laser range finder and a total station are used for accurately measuring the positions of the steel column and the foundation, then high-precision data can be provided, workers are helped to rapidly adjust the position of the steel column, and perpendicularity and horizontality of installation are ensured. The invention relates to the technical field of building construction, in particular to a construction method for improving the steel column installation precision, and through the method, the steel column installation precision can be improved, the installation error is reduced, and then the overall quality and safety of a building are guaranteed.
本发明公开了一种提高钢柱安装精度的施工方法,包括对现场进行精确的测量和标志,在进行钢柱安装前,确保对地基或基础进行精确的测量和标志,在钢柱和地基预埋件上预先设置标志点或者标记线,以确保安装时定位的准确性,通过对标志进行特定的凸起或者颜色以便于标记和区分,进而能够辅助工人精确地定位和调整钢柱的位置;激光测量技术:使用激光测距仪和全站仪对钢柱和基础的位置进行精确测量,进而能够提供高精度的数据,帮助工人快速调整钢柱位置,确保安装的垂直性和水平性。本发明涉及建筑施工技术领域,具体为一种提高钢柱安装精度的施工方法,通过本方法,能够提高对钢柱安装的精度,减小安装误差进而保障了建筑物整体质量和安全。
Construction method for improving installation precision of steel column
The invention discloses a construction method for improving the installation precision of a steel column, which comprises the following steps of: accurately measuring and marking a site, ensuring that a foundation or a foundation is accurately measured and marked before the steel column is installed, and presetting mark points or mark lines on the steel column and an embedded part of the foundation so as to ensure the positioning accuracy during installation. Marking and distinguishing are facilitated by conducting specific protrusion or color on the marks, and then workers can be assisted in accurately positioning and adjusting the position of the steel column; according to the laser measurement technology, a laser range finder and a total station are used for accurately measuring the positions of the steel column and the foundation, then high-precision data can be provided, workers are helped to rapidly adjust the position of the steel column, and perpendicularity and horizontality of installation are ensured. The invention relates to the technical field of building construction, in particular to a construction method for improving the steel column installation precision, and through the method, the steel column installation precision can be improved, the installation error is reduced, and then the overall quality and safety of a building are guaranteed.
本发明公开了一种提高钢柱安装精度的施工方法,包括对现场进行精确的测量和标志,在进行钢柱安装前,确保对地基或基础进行精确的测量和标志,在钢柱和地基预埋件上预先设置标志点或者标记线,以确保安装时定位的准确性,通过对标志进行特定的凸起或者颜色以便于标记和区分,进而能够辅助工人精确地定位和调整钢柱的位置;激光测量技术:使用激光测距仪和全站仪对钢柱和基础的位置进行精确测量,进而能够提供高精度的数据,帮助工人快速调整钢柱位置,确保安装的垂直性和水平性。本发明涉及建筑施工技术领域,具体为一种提高钢柱安装精度的施工方法,通过本方法,能够提高对钢柱安装的精度,减小安装误差进而保障了建筑物整体质量和安全。
Construction method for improving installation precision of steel column
一种提高钢柱安装精度的施工方法
WANG HUIJUAN (Autor:in) / LIN LIANG (Autor:in) / GAO SHUJUN (Autor:in)
17.09.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for improving installation precision of steel column
Europäisches Patentamt | 2021
|Construction method for accurate steel pipe column installation
Europäisches Patentamt | 2015
|Construction method capable of improving installation precision of truss
Europäisches Patentamt | 2022
|Installation and construction method of steel reinforced column
Europäisches Patentamt | 2024
|Assembly type rectangular steel column installation and construction method
Europäisches Patentamt | 2024
|