Connecting structure of steel cover beam and concrete filled steel tube lattice pier
The invention relates to the technical field of bridge substructure construction, in particular to a steel cover beam and concrete filled steel tube lattice pier connecting structure which comprises a steel cover beam body and a concrete filled steel tube lattice pier. The steel cover beam main body comprises two main beams which are arranged in parallel and a main beam connecting system which is positioned between the two main beams and is connected with the main beams; the main beam is of a single-box double-chamber structure; the main beam is connected with the concrete filled steel tube lattice pier in a socket and spigot joint manner; concrete is poured at the joint of the main beam and the concrete filled steel tube lattice pier, and concrete is poured in a box chamber structure of the main beam. The structure is high in stability, short in construction period and capable of well adapting to rapid change of the water level in a short time, and construction risks are reduced.
本发明涉及桥梁下部结构施工技术领域,特别涉及一种钢盖梁与钢管混凝土格构墩连接结构,包括钢盖梁主体和钢管混凝土格构墩;所述钢盖梁主体包括彼此平行设置的两根主梁和位于两根所述主梁之间,连接所述主梁的主梁连接系;所述主梁为单箱双室结构;所述主梁和所述钢管混凝土格构墩承插式连接;所述主梁和所述钢管混凝土格构墩的连接处浇筑混凝土,所述主梁的箱室结构中浇筑混凝土。该结构稳定性强,施工周期短,能够很好的适应短时间的水位快速变化,降低了施工风险。
Connecting structure of steel cover beam and concrete filled steel tube lattice pier
The invention relates to the technical field of bridge substructure construction, in particular to a steel cover beam and concrete filled steel tube lattice pier connecting structure which comprises a steel cover beam body and a concrete filled steel tube lattice pier. The steel cover beam main body comprises two main beams which are arranged in parallel and a main beam connecting system which is positioned between the two main beams and is connected with the main beams; the main beam is of a single-box double-chamber structure; the main beam is connected with the concrete filled steel tube lattice pier in a socket and spigot joint manner; concrete is poured at the joint of the main beam and the concrete filled steel tube lattice pier, and concrete is poured in a box chamber structure of the main beam. The structure is high in stability, short in construction period and capable of well adapting to rapid change of the water level in a short time, and construction risks are reduced.
本发明涉及桥梁下部结构施工技术领域,特别涉及一种钢盖梁与钢管混凝土格构墩连接结构,包括钢盖梁主体和钢管混凝土格构墩;所述钢盖梁主体包括彼此平行设置的两根主梁和位于两根所述主梁之间,连接所述主梁的主梁连接系;所述主梁为单箱双室结构;所述主梁和所述钢管混凝土格构墩承插式连接;所述主梁和所述钢管混凝土格构墩的连接处浇筑混凝土,所述主梁的箱室结构中浇筑混凝土。该结构稳定性强,施工周期短,能够很好的适应短时间的水位快速变化,降低了施工风险。
Connecting structure of steel cover beam and concrete filled steel tube lattice pier
一种钢盖梁与钢管混凝土格构墩连接结构
WEI KE (Autor:in) / LIU LI (Autor:in) / FENG XIAOYANG (Autor:in) / ZOU YU (Autor:in) / LU WEI (Autor:in) / YU ZHIBING (Autor:in) / LIU WANCHUN (Autor:in) / LI HAIQING (Autor:in) / XIANG ZHENGSONG (Autor:in) / DENG HENGCHANG (Autor:in)
01.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2024
|Connecting structure of steel cover beam and concrete rectangular pier column
Europäisches Patentamt | 2023
|Prefabricated assembled concrete-filled steel tube pier