Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Supporting device for same-layer construction of super high-rise core tube and steel structure
The invention provides a supporting device for same-layer construction of a super high-rise core tube and a steel structure, and relates to the field of building construction. The device comprises three first supporting pieces, the two sides of one first supporting piece are each fixedly connected with two second supporting pieces up and down, guide grooves are formed in one sides of the four second supporting pieces, and the tops and the bottoms of the outer sides of the remaining two first supporting pieces are each fixedly connected with two third supporting pieces; one ends of the two third supporting pieces fixedly connected to the same side of one supporting piece are arranged in the two second supporting pieces on the same side respectively, and the two sides of the first supporting piece are each provided with an inclined force unloading structure composed of a fixing frame, an inclined supporting plate and a grounding plate. The inclined force unloading structure supports the first supporting piece to enable the first supporting piece to be kept perpendicular, the inclined force applied to the first supporting piece by the steel structure acts on the ground, the working stability of the construction supporting device for temporary supporting is improved, and the stress strength is improved.
本发明提供一种超高层核心筒与钢结构同层施工的支撑装置,涉及建筑施工领域。本发明包括三个支撑件一,其中一个所述支撑件一两侧均一上一下固定连接有两个支撑件二,四个所述支撑件二一侧均开设有导向槽,剩余的两个所述支撑件一外侧顶部和底部均固定连接有两个支撑件三,其中一个所述支撑件一同侧固定连接的两个所述支撑件三一端分别设置于其中同侧的两个所述支撑件二内部,在支撑件一两侧均安装一个固定架、斜支撑板和接地板构成的倾斜卸力结构,倾斜卸力结构对支撑件一进行支撑使其保持垂直,将钢结构施加给支撑件一的倾斜力作用到地面上,提高临时支护的施工支撑装置工作的稳固性,提高受力强度。
Supporting device for same-layer construction of super high-rise core tube and steel structure
The invention provides a supporting device for same-layer construction of a super high-rise core tube and a steel structure, and relates to the field of building construction. The device comprises three first supporting pieces, the two sides of one first supporting piece are each fixedly connected with two second supporting pieces up and down, guide grooves are formed in one sides of the four second supporting pieces, and the tops and the bottoms of the outer sides of the remaining two first supporting pieces are each fixedly connected with two third supporting pieces; one ends of the two third supporting pieces fixedly connected to the same side of one supporting piece are arranged in the two second supporting pieces on the same side respectively, and the two sides of the first supporting piece are each provided with an inclined force unloading structure composed of a fixing frame, an inclined supporting plate and a grounding plate. The inclined force unloading structure supports the first supporting piece to enable the first supporting piece to be kept perpendicular, the inclined force applied to the first supporting piece by the steel structure acts on the ground, the working stability of the construction supporting device for temporary supporting is improved, and the stress strength is improved.
本发明提供一种超高层核心筒与钢结构同层施工的支撑装置,涉及建筑施工领域。本发明包括三个支撑件一,其中一个所述支撑件一两侧均一上一下固定连接有两个支撑件二,四个所述支撑件二一侧均开设有导向槽,剩余的两个所述支撑件一外侧顶部和底部均固定连接有两个支撑件三,其中一个所述支撑件一同侧固定连接的两个所述支撑件三一端分别设置于其中同侧的两个所述支撑件二内部,在支撑件一两侧均安装一个固定架、斜支撑板和接地板构成的倾斜卸力结构,倾斜卸力结构对支撑件一进行支撑使其保持垂直,将钢结构施加给支撑件一的倾斜力作用到地面上,提高临时支护的施工支撑装置工作的稳固性,提高受力强度。
Supporting device for same-layer construction of super high-rise core tube and steel structure
一种超高层核心筒与钢结构同层施工的支撑装置
CHEN XIAO (Autor:in) / DU ZHIHAO (Autor:in) / GUO QIANG (Autor:in) / LIN ERXING (Autor:in) / JI XIANG (Autor:in) / ZHAO YACHAO (Autor:in) / FANG HAIBO (Autor:in) / WANG WEI (Autor:in) / JU BAOGUO (Autor:in)
08.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Construction method for steel structure podium building of core tube super high-rise building
Europäisches Patentamt | 2023
|Construction method of super-high-rise core tube wall concrete structure
Europäisches Patentamt | 2016
|Super high-rise transfer layer steel structure construction method
Europäisches Patentamt | 2021
|