The invention relates to a four-line method rapid construction flatness control construction method. Specific surveying and setting out comprises the following steps that S1, two vertical perpendicular lines are positioned on the edge portion of a construction range on a large surface of a construction area through a laser instrument; s2, fixing points are arranged along a vertical line from top to bottom; s3, selecting a positioning device according to the thickness of a drawing, and fixing the positioning device on the fixed point; s4, a vertical steel wire rope penetrates through the positioning device from top to bottom to be arranged, and a fastening device is arranged at the bottom or a heavy object is hung; s5, the perpendicularity of the steel wire rope is checked and adjusted in the direction parallel to the wall; s6, according to the construction part, two horizontal elastic ropes are arranged on the vertical steel wire rope, and the elastic ropes are pulled up and down on the steel wire rope; and S7, the fixing points are dismantled after finishing the facing mortar. According to the method, a four-line construction flatness control method is utilized, and the overall flatness is controlled by combining a plane control principle, static control and dynamic control, so that the construction speed can be increased, and the construction quality can be improved.
本发明涉及一种四线法快速施工平整度控制工法,具体测量放线包括如下步骤:S1:在施工区域大面上利用激光仪在施工范围的边缘部位定位两条竖向垂直线;S2:沿垂直线从上往下设置固定点;S3:根据图纸做法厚度选用定位装置,并固定在固定点上;S4:从顶到底穿过定位装置设置垂直钢丝绳,并在底部设置紧固装置或悬挂重物;S5:从沿墙平行方向校核钢丝绳的垂直度并调整;S6:根据施工部位,在垂直钢丝绳上设置两根水平弹力绳,弹力绳分别在钢丝绳上上下拉动;S7:固定点在完成罩面砂浆后拆除。本发明利用四线法施工平整度控制工法,利用平面控制原理,静态控制与动态控制相结合来进行整体性平整度控制,从而能够加快施工速度,提高施工质量。
The invention relates to a four-line method rapid construction flatness control construction method. Specific surveying and setting out comprises the following steps that S1, two vertical perpendicular lines are positioned on the edge portion of a construction range on a large surface of a construction area through a laser instrument; s2, fixing points are arranged along a vertical line from top to bottom; s3, selecting a positioning device according to the thickness of a drawing, and fixing the positioning device on the fixed point; s4, a vertical steel wire rope penetrates through the positioning device from top to bottom to be arranged, and a fastening device is arranged at the bottom or a heavy object is hung; s5, the perpendicularity of the steel wire rope is checked and adjusted in the direction parallel to the wall; s6, according to the construction part, two horizontal elastic ropes are arranged on the vertical steel wire rope, and the elastic ropes are pulled up and down on the steel wire rope; and S7, the fixing points are dismantled after finishing the facing mortar. According to the method, a four-line construction flatness control method is utilized, and the overall flatness is controlled by combining a plane control principle, static control and dynamic control, so that the construction speed can be increased, and the construction quality can be improved.
本发明涉及一种四线法快速施工平整度控制工法,具体测量放线包括如下步骤:S1:在施工区域大面上利用激光仪在施工范围的边缘部位定位两条竖向垂直线;S2:沿垂直线从上往下设置固定点;S3:根据图纸做法厚度选用定位装置,并固定在固定点上;S4:从顶到底穿过定位装置设置垂直钢丝绳,并在底部设置紧固装置或悬挂重物;S5:从沿墙平行方向校核钢丝绳的垂直度并调整;S6:根据施工部位,在垂直钢丝绳上设置两根水平弹力绳,弹力绳分别在钢丝绳上上下拉动;S7:固定点在完成罩面砂浆后拆除。本发明利用四线法施工平整度控制工法,利用平面控制原理,静态控制与动态控制相结合来进行整体性平整度控制,从而能够加快施工速度,提高施工质量。
Four-line method rapid construction flatness control construction method
一种四线法快速施工平整度控制工法
22.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Asphalt pavement construction flatness control device
Europäisches Patentamt | 2023
|Construction surface flatness detection method and device
Europäisches Patentamt | 2023
|Construction method for improving bridge deck flatness
Europäisches Patentamt | 2020
|