Board flatness control construction method
The embodiment of the invention discloses a plate surface flatness control construction method which adopts a plate surface flatness control device and comprises the steps that a supporting structure is connected with the bottom end of a connecting screw rod, an adjusting nut assembly comprises a first adjusting nut and a second adjusting nut, and the first adjusting nut and the second adjusting nut are sequentially arranged on the connecting screw rod in a sleeving mode from top to bottom; one end of the round steel is connected with the second adjusting nut, and the round steel is perpendicular to the connecting screw; the method comprises the following steps: after a plate surface template is mounted, leveling the flatness of the plate surface template and checking and accepting the plate surface template; after the flatness of the beam plate formwork is leveled and accepted to be qualified, beam plate steel bars are bound; the method comprises the following steps of: checking and accepting beam plate templates and steel bar concealment, arranging a plate surface flatness control device on a template plate surface after the beam plate templates and the steel bar concealment pass the checking and accepting and before pouring concrete, then adjusting round steel of the plate surface flatness control device to a concrete pouring elevation, and abutting and fixing second adjusting nuts by rotating first adjusting nuts; and plate surface concrete is poured to the round steel surface marking line.
本申请实施例公开了一种板面平整度控制施工方法,方法采用板面平整度控制装置,包括:支撑结构与连接螺杆的底端连接,调节螺母组件包括第一调节螺母、第二调节螺母,第一调节螺母、第二调节螺母从上到下依次套设于连接螺杆上,圆钢的一端与第二调节螺母连接,且圆钢与连接螺杆相互垂直;方法包括步骤:在板面模板安装完成后,进行板面模板平整度校平并进行验收;梁板模板平整度校平验收合格后,绑扎梁板钢筋;对梁板模板、钢筋隐蔽进行验收,验收合格后,在浇筑混凝土前,在模板板面上布置板面平整度控制装置,然后将板面平整度控制装置的圆钢调至混凝土浇筑标高,并通过旋转第一调节螺母抵接并固定第二调节螺母;浇筑板面砼至圆钢表面标记线。
Board flatness control construction method
The embodiment of the invention discloses a plate surface flatness control construction method which adopts a plate surface flatness control device and comprises the steps that a supporting structure is connected with the bottom end of a connecting screw rod, an adjusting nut assembly comprises a first adjusting nut and a second adjusting nut, and the first adjusting nut and the second adjusting nut are sequentially arranged on the connecting screw rod in a sleeving mode from top to bottom; one end of the round steel is connected with the second adjusting nut, and the round steel is perpendicular to the connecting screw; the method comprises the following steps: after a plate surface template is mounted, leveling the flatness of the plate surface template and checking and accepting the plate surface template; after the flatness of the beam plate formwork is leveled and accepted to be qualified, beam plate steel bars are bound; the method comprises the following steps of: checking and accepting beam plate templates and steel bar concealment, arranging a plate surface flatness control device on a template plate surface after the beam plate templates and the steel bar concealment pass the checking and accepting and before pouring concrete, then adjusting round steel of the plate surface flatness control device to a concrete pouring elevation, and abutting and fixing second adjusting nuts by rotating first adjusting nuts; and plate surface concrete is poured to the round steel surface marking line.
本申请实施例公开了一种板面平整度控制施工方法,方法采用板面平整度控制装置,包括:支撑结构与连接螺杆的底端连接,调节螺母组件包括第一调节螺母、第二调节螺母,第一调节螺母、第二调节螺母从上到下依次套设于连接螺杆上,圆钢的一端与第二调节螺母连接,且圆钢与连接螺杆相互垂直;方法包括步骤:在板面模板安装完成后,进行板面模板平整度校平并进行验收;梁板模板平整度校平验收合格后,绑扎梁板钢筋;对梁板模板、钢筋隐蔽进行验收,验收合格后,在浇筑混凝土前,在模板板面上布置板面平整度控制装置,然后将板面平整度控制装置的圆钢调至混凝土浇筑标高,并通过旋转第一调节螺母抵接并固定第二调节螺母;浇筑板面砼至圆钢表面标记线。
Board flatness control construction method
板面平整度控制施工方法
WANG XU (Autor:in) / XI JING (Autor:in) / YANG LIWEN (Autor:in) / MA HONGJING (Autor:in) / LI QILIN (Autor:in) / CHEN ZONGGUI (Autor:in) / LIU HAN (Autor:in) / LUO ZHONGCHENG (Autor:in) / AO XUEYING (Autor:in) / TANG MINGFU (Autor:in)
16.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Four-line method rapid construction flatness control construction method
Europäisches Patentamt | 2024
|Asphalt pavement construction flatness control device
Europäisches Patentamt | 2023
|