Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Jig frame top tool for temporary supporting and unloading of steel structure
The invention provides a jig frame top tool for temporary supporting and unloading of a steel structure, and belongs to the technical field of jig frame tools. The multiple connecting rods are movably embedded in one side of the mounting base, every two connecting rods form a group, and arc-shaped plates are fixedly arranged on one sides of the two groups of connecting rods. During use, a pull ring is pulled upwards, so that the two arc-shaped plates move upwards, a supporting column is placed below the two fixing plates, and the supporting column is fixed through the arc-shaped plates; furthermore, two fixing plates tightly press the supporting column, at the moment, a pull ring is loosened, a plurality of limiting plates are pulled through elastic force generated by a plurality of first springs, a plurality of connecting rods are further pulled, accordingly, two arc-shaped plates extrude one side of the supporting base, the supporting column is further fixed to the supporting base through the two fixing plates, and fixing of the supporting column is completed; therefore, the fixing mode of the supporting column is simple, only the pull ring needs to be pulled, and subsequent unloading of the supporting column is also facilitated.
本发明提供了一种用于钢结构临时支撑和卸载的胎架顶部工装,属于胎架工装技术领域,该工装包括:支撑底座和安装座;多个连接杆,活动嵌设于所述安装座的一侧,且多个连接杆两两一组,两组所述连接杆的一侧均固定设置有弧形板,本发明在使用时,通过向上拉动拉环,使得两个弧形板向上移动,将支撑柱放置于两个固定板的下方位置,进一步使得两个固定板压紧支撑柱,松开拉环此时多个第一弹簧产生的弹力,拉动多个限位板进一步拉动多个连接杆,从而使得两个弧形板向支撑底座的一侧挤压,进一步使得两个固定板将支撑柱固定在支撑底座上面,完成支撑柱的固定,从而支撑柱的固定方式简单,拉动拉环即可,也方便后续支撑柱的卸载。
Jig frame top tool for temporary supporting and unloading of steel structure
The invention provides a jig frame top tool for temporary supporting and unloading of a steel structure, and belongs to the technical field of jig frame tools. The multiple connecting rods are movably embedded in one side of the mounting base, every two connecting rods form a group, and arc-shaped plates are fixedly arranged on one sides of the two groups of connecting rods. During use, a pull ring is pulled upwards, so that the two arc-shaped plates move upwards, a supporting column is placed below the two fixing plates, and the supporting column is fixed through the arc-shaped plates; furthermore, two fixing plates tightly press the supporting column, at the moment, a pull ring is loosened, a plurality of limiting plates are pulled through elastic force generated by a plurality of first springs, a plurality of connecting rods are further pulled, accordingly, two arc-shaped plates extrude one side of the supporting base, the supporting column is further fixed to the supporting base through the two fixing plates, and fixing of the supporting column is completed; therefore, the fixing mode of the supporting column is simple, only the pull ring needs to be pulled, and subsequent unloading of the supporting column is also facilitated.
本发明提供了一种用于钢结构临时支撑和卸载的胎架顶部工装,属于胎架工装技术领域,该工装包括:支撑底座和安装座;多个连接杆,活动嵌设于所述安装座的一侧,且多个连接杆两两一组,两组所述连接杆的一侧均固定设置有弧形板,本发明在使用时,通过向上拉动拉环,使得两个弧形板向上移动,将支撑柱放置于两个固定板的下方位置,进一步使得两个固定板压紧支撑柱,松开拉环此时多个第一弹簧产生的弹力,拉动多个限位板进一步拉动多个连接杆,从而使得两个弧形板向支撑底座的一侧挤压,进一步使得两个固定板将支撑柱固定在支撑底座上面,完成支撑柱的固定,从而支撑柱的固定方式简单,拉动拉环即可,也方便后续支撑柱的卸载。
Jig frame top tool for temporary supporting and unloading of steel structure
一种用于钢结构临时支撑和卸载的胎架顶部工装
GAO XIONGJIAN (Autor:in) / HAO YIDE (Autor:in) / YUAN DEKUI (Autor:in) / LIU JIA (Autor:in) / NIE YIJIA (Autor:in) / LI YANQIANG (Autor:in) / ZHAO JINCHENG (Autor:in)
25.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel truss column top temporary supporting and unloading device
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Combined unloading method for large temporary supporting system
Europäisches Patentamt | 2022
|