Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Template system and preparation method thereof
The invention belongs to the technical field of building construction, and discloses a formwork system and a preparation method of the formwork system. The formwork system comprises a formwork unit and a supporting device. The formwork unit comprises at least one formwork assembly and a plurality of first connecting assemblies. The formwork assembly comprises a plurality of branch formworks which are sequentially spliced end to end, the branch formworks are sequentially spliced end to end to form a pouring cavity in a surrounding mode, and first connecting bosses are arranged at the head ends and the tail ends of the branch formworks in the direction opposite to the pouring cavity in a protruding mode. The first connecting assemblies are detachably connected with the first connecting bosses of the two adjacent sub-mold plates. The supporting device comprises a supporting frame body and a plurality of jacking assemblies, the supporting frame body is arranged outside the formwork units in a surrounding mode, and the jacking assemblies are connected with the supporting frame body and abut against the formwork units. The formwork units and the supporting devices are assembled in a modular mode, the building time can be shortened, and the working efficiency is improved. And the first connecting bosses are arranged, so that the structural strength of the sub-formworks can be enhanced, the jacking effect is enhanced, and the overall stability of the formwork unit is guaranteed.
本发明属于建筑施工技术领域,公开了一种模板系统及模板系统的制备方法。模板系统包括模板单元和支撑装置,模板单元包括至少一个模板组件和多个第一连接组件。模板组件包括多个依次首尾拼接的分模板,多个分模板依次首尾拼接后围设形成浇筑腔,分模板的首尾两端均朝背向浇筑腔的方向凸设有第一连接凸台。第一连接组件均与相邻两个分模板的第一连接凸台可拆卸连接。支撑装置包括支撑框体和多个顶紧组件,支撑框体围设于模板单元外,顶紧组件与支撑框体连接,并顶紧于模板单元。模板单元和支撑装置分模块组装,可减少搭建的时间,提高工作效率。设置第一连接凸台,可以增强分模板的结构强度,加强顶紧效果,保证模板单元的整体稳定性。
Template system and preparation method thereof
The invention belongs to the technical field of building construction, and discloses a formwork system and a preparation method of the formwork system. The formwork system comprises a formwork unit and a supporting device. The formwork unit comprises at least one formwork assembly and a plurality of first connecting assemblies. The formwork assembly comprises a plurality of branch formworks which are sequentially spliced end to end, the branch formworks are sequentially spliced end to end to form a pouring cavity in a surrounding mode, and first connecting bosses are arranged at the head ends and the tail ends of the branch formworks in the direction opposite to the pouring cavity in a protruding mode. The first connecting assemblies are detachably connected with the first connecting bosses of the two adjacent sub-mold plates. The supporting device comprises a supporting frame body and a plurality of jacking assemblies, the supporting frame body is arranged outside the formwork units in a surrounding mode, and the jacking assemblies are connected with the supporting frame body and abut against the formwork units. The formwork units and the supporting devices are assembled in a modular mode, the building time can be shortened, and the working efficiency is improved. And the first connecting bosses are arranged, so that the structural strength of the sub-formworks can be enhanced, the jacking effect is enhanced, and the overall stability of the formwork unit is guaranteed.
本发明属于建筑施工技术领域,公开了一种模板系统及模板系统的制备方法。模板系统包括模板单元和支撑装置,模板单元包括至少一个模板组件和多个第一连接组件。模板组件包括多个依次首尾拼接的分模板,多个分模板依次首尾拼接后围设形成浇筑腔,分模板的首尾两端均朝背向浇筑腔的方向凸设有第一连接凸台。第一连接组件均与相邻两个分模板的第一连接凸台可拆卸连接。支撑装置包括支撑框体和多个顶紧组件,支撑框体围设于模板单元外,顶紧组件与支撑框体连接,并顶紧于模板单元。模板单元和支撑装置分模块组装,可减少搭建的时间,提高工作效率。设置第一连接凸台,可以增强分模板的结构强度,加强顶紧效果,保证模板单元的整体稳定性。
Template system and preparation method thereof
一种模板系统及模板系统的制备方法
ZHOU FENG (Autor:in) / HU YI (Autor:in) / LU CHENGLIN (Autor:in) / ZHENG XIANGJIE (Autor:in) / GENG SHUAI (Autor:in) / WU XIAOFENG (Autor:in) / ZHOU MING (Autor:in)
29.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Finalized stairway template supporting system and preparation method thereof
Europäisches Patentamt | 2020
|Recyclable aluminum template and preparation method thereof
Europäisches Patentamt | 2024
|Building template material and preparation method thereof
Europäisches Patentamt | 2020
|Aluminum alloy building template and preparation method thereof
Europäisches Patentamt | 2015
|FRP-UHPC permanent template and preparation method thereof
Europäisches Patentamt | 2021
|