Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bagged filler and construction method thereof
The invention relates to the technical field of road maintenance, in particular to bagged filler and a construction method thereof.The bagged filler comprises a multi-section filler bag and filler, each section of filler bag of the multi-section filler bag is internally provided with a fillable sealing cavity, and every two adjacent sealing cavities are not communicated with each other; the multi-section filler bag comprises a filled filler bag and an unfilled filler bag, the filled filler bag is filled with filler and sealed in vacuum, and the unfilled filler bag is vacuumized; the unfilled filler bag is arranged between the two filled filler bags, so that the filled filler bag of an adjacent multi-section filler bag can be embedded between the two filled filler bags of another multi-section filler bag. And the adjacent multi-section filler bags are quickly assembled and fixed through embedding and lapping, so that the first-aid repair construction process is simple, convenient and quick. The roadbed body and the side slope body after first-aid repair have good strength, deformation resistance and high stability. The emergency repair time is short, the construction efficiency is high, and the construction cost of the emergency repair project is low.
本发明涉及道路维修技术领域,尤其涉及一种袋装填料及其施工方法,包括:多段式填料袋和填料,多段式填料袋的每段填料袋内具有可填充的密封空腔,相邻的密封空腔之间互不连通;多段式填料袋包括填充的填料袋和未填充的填料袋,填充的填料袋内部填充填料并真空密封,未填充的填料袋内部抽真空;未填充的填料袋设置在两个填充的填料袋之间,以使相邻的一个多段式填料袋的填充的填料袋能够嵌合在另一多段式填料袋的两个填充的填料袋之间。相邻的多段式填料袋通过嵌合搭接快速完成拼装固定,抢修施工过程简便快捷。抢修后的路基体、边坡体有良好的强度、抗变形能力,稳定性高。抢修施工完成后可以立即通车,抢修时间短,施工效率高,抢修工程造价低。
Bagged filler and construction method thereof
The invention relates to the technical field of road maintenance, in particular to bagged filler and a construction method thereof.The bagged filler comprises a multi-section filler bag and filler, each section of filler bag of the multi-section filler bag is internally provided with a fillable sealing cavity, and every two adjacent sealing cavities are not communicated with each other; the multi-section filler bag comprises a filled filler bag and an unfilled filler bag, the filled filler bag is filled with filler and sealed in vacuum, and the unfilled filler bag is vacuumized; the unfilled filler bag is arranged between the two filled filler bags, so that the filled filler bag of an adjacent multi-section filler bag can be embedded between the two filled filler bags of another multi-section filler bag. And the adjacent multi-section filler bags are quickly assembled and fixed through embedding and lapping, so that the first-aid repair construction process is simple, convenient and quick. The roadbed body and the side slope body after first-aid repair have good strength, deformation resistance and high stability. The emergency repair time is short, the construction efficiency is high, and the construction cost of the emergency repair project is low.
本发明涉及道路维修技术领域,尤其涉及一种袋装填料及其施工方法,包括:多段式填料袋和填料,多段式填料袋的每段填料袋内具有可填充的密封空腔,相邻的密封空腔之间互不连通;多段式填料袋包括填充的填料袋和未填充的填料袋,填充的填料袋内部填充填料并真空密封,未填充的填料袋内部抽真空;未填充的填料袋设置在两个填充的填料袋之间,以使相邻的一个多段式填料袋的填充的填料袋能够嵌合在另一多段式填料袋的两个填充的填料袋之间。相邻的多段式填料袋通过嵌合搭接快速完成拼装固定,抢修施工过程简便快捷。抢修后的路基体、边坡体有良好的强度、抗变形能力,稳定性高。抢修施工完成后可以立即通车,抢修时间短,施工效率高,抢修工程造价低。
Bagged filler and construction method thereof
一种袋装填料及其施工方法
CHENG FUQIANG (Autor:in) / WEI KONGCHUN (Autor:in) / WANG YONGGUO (Autor:in) / GUO SHAOYING (Autor:in) / MAO ZHONGLIANG (Autor:in) / SONG GUORONG (Autor:in) / TANG PEI (Autor:in) / DING XINHONG (Autor:in) / MO WANYUAN (Autor:in) / FENG YONGYANG (Autor:in)
07.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Working well bagged filler and manufacturing method thereof
Europäisches Patentamt | 2024
|Bagged steel slag sand well soft foundation treatment structure and construction method thereof
Europäisches Patentamt | 2021
|Bagged hot-melt calabash body full-recovery anchor rod and construction method thereof
Europäisches Patentamt | 2020
|