Thermal power plant main power house arrangement device
The thermal power plant main power house arrangement device comprises steam turbine generator base columns and steam turbine large platform columns (the steam turbine large platform columns related to the peripheries of the steam turbine base columns), and fair-faced formworks, wood battens and reinforcing channel steel are arranged between the steam turbine generator base columns and the steam turbine large platform columns. The fair-faced formworks, the wood battens and the reinforcing channel steel are arranged to form the minimum net space distance between the steam turbine generator base column and the steam turbine large platform column so that synchronous pouring of the steam turbine generator base column and the steam turbine large platform column can be achieved. According to the arrangement device for the main power house of the thermal power plant, enough clear spacing is reserved during preliminary design of steam turbine generator base columns and steam turbine large platform columns, so that synchronous concrete pouring of the steam turbine generator base columns and the steam turbine large platform columns is achieved, safety risks are reduced, construction cost is reduced, the construction period is shortened, and preconditions are created for early production, power generation and income creation of a project; and multi-party mutual benefit and win-win are realized.
本发明公开了火力发电厂主厂房布置装置,包括汽轮发电机基座柱子和汽机大平台柱子(与汽机基座柱子周边有关的汽机大平台柱子),所述汽轮发电机基座柱子和汽机大平台柱子之间设置有清水模板、木档和加固槽钢,所述清水模板、木档和加固槽钢排列形成汽轮发电机基座柱子和汽机大平台柱子之间的最小净空间间距,以满足汽轮发电机基座柱子和汽机大平台柱子实现同步浇筑。本发明火力发电厂主厂房布置装置在汽轮发电机基座柱子和汽机大平台柱子初步设计时留有足够的净间距尺寸,以实现二者同步浇筑混凝土、降低安全风险、降低施工成本、缩短建设工期,为项目早日投产发电创收创造先决条件,实现多方互利共赢。
Thermal power plant main power house arrangement device
The thermal power plant main power house arrangement device comprises steam turbine generator base columns and steam turbine large platform columns (the steam turbine large platform columns related to the peripheries of the steam turbine base columns), and fair-faced formworks, wood battens and reinforcing channel steel are arranged between the steam turbine generator base columns and the steam turbine large platform columns. The fair-faced formworks, the wood battens and the reinforcing channel steel are arranged to form the minimum net space distance between the steam turbine generator base column and the steam turbine large platform column so that synchronous pouring of the steam turbine generator base column and the steam turbine large platform column can be achieved. According to the arrangement device for the main power house of the thermal power plant, enough clear spacing is reserved during preliminary design of steam turbine generator base columns and steam turbine large platform columns, so that synchronous concrete pouring of the steam turbine generator base columns and the steam turbine large platform columns is achieved, safety risks are reduced, construction cost is reduced, the construction period is shortened, and preconditions are created for early production, power generation and income creation of a project; and multi-party mutual benefit and win-win are realized.
本发明公开了火力发电厂主厂房布置装置,包括汽轮发电机基座柱子和汽机大平台柱子(与汽机基座柱子周边有关的汽机大平台柱子),所述汽轮发电机基座柱子和汽机大平台柱子之间设置有清水模板、木档和加固槽钢,所述清水模板、木档和加固槽钢排列形成汽轮发电机基座柱子和汽机大平台柱子之间的最小净空间间距,以满足汽轮发电机基座柱子和汽机大平台柱子实现同步浇筑。本发明火力发电厂主厂房布置装置在汽轮发电机基座柱子和汽机大平台柱子初步设计时留有足够的净间距尺寸,以实现二者同步浇筑混凝土、降低安全风险、降低施工成本、缩短建设工期,为项目早日投产发电创收创造先决条件,实现多方互利共赢。
Thermal power plant main power house arrangement device
火力发电厂主厂房布置装置
ZHAO PINGLU (Autor:in) / XU LU (Autor:in) / LIU LONGJUN (Autor:in) / ZHANG JUN (Autor:in) / HUANG XINGYU (Autor:in) / LI CHAO (Autor:in) / ZHAO RUIYANG (Autor:in) / WANG JIANHUA (Autor:in) / CHEN GANG (Autor:in) / LIU GUOBIN (Autor:in)
24.01.2025
Patent
Elektronische Ressource
Chinesisch
Gas-steam combined cycle main power house arrangement structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Novel bunker bay structure of main power house of thermal power plant
Europäisches Patentamt | 2024
|Nuclear power plant nuclear island main power house structure
Europäisches Patentamt | 2025
|