PROBLEM TO BE SOLVED: To provide a method for preventing scouring due to high-speed water flow generated in a space of a wave dissipating structure stacked by engaging blocks with projections.SOLUTION: Wave dissipating blocks 1 with projections in a plurality of directions three-dimensionally are stacked in the engaging condition, and a filling material 2 comprising ballast or crushed stone is packed in a space between the wave dissipating blocks 1, and a median particle diameter of the filling material 2 is made 1 cm or larger so as to prevent runoff of the filling material due to flowing water. The filling height of the filling material is limited at least to the height of the center of gravity of the wave dissipating block 1 from a contact area. The filling material suppresses the speed of water flow passing a space between the wave dissipating blocks so as to prevent scouring of a contact area of the wave dissipating blocks.SELECTED DRAWING: Figure 1
【課題】突起部を持つブロックを噛み合わせて積み上げた水工構造物の間隙に生ずる高速の水流による洗掘を防止する方法を提供する。【解決手段】立体的に複数の向きに突起を有する消波ブロック1が噛み合い状態で積み上げてあり、消波ブロック1同士の間隙には砂利または砕石からなる中詰材2が充填してあり、この中詰材2の中央粒径を1cm以上とすることにより流水による中詰材の流亡を防止する。中詰材の充填高さは接地面から少なくとも消波ブロック1の重心高さまでとする。中詰材が消波ブロックの間隙を通過する水流の速度を抑制することによって消波ブロックの接地面の洗掘が防止される。【選択図】図1
PROBLEM TO BE SOLVED: To provide a method for preventing scouring due to high-speed water flow generated in a space of a wave dissipating structure stacked by engaging blocks with projections.SOLUTION: Wave dissipating blocks 1 with projections in a plurality of directions three-dimensionally are stacked in the engaging condition, and a filling material 2 comprising ballast or crushed stone is packed in a space between the wave dissipating blocks 1, and a median particle diameter of the filling material 2 is made 1 cm or larger so as to prevent runoff of the filling material due to flowing water. The filling height of the filling material is limited at least to the height of the center of gravity of the wave dissipating block 1 from a contact area. The filling material suppresses the speed of water flow passing a space between the wave dissipating blocks so as to prevent scouring of a contact area of the wave dissipating blocks.SELECTED DRAWING: Figure 1
【課題】突起部を持つブロックを噛み合わせて積み上げた水工構造物の間隙に生ずる高速の水流による洗掘を防止する方法を提供する。【解決手段】立体的に複数の向きに突起を有する消波ブロック1が噛み合い状態で積み上げてあり、消波ブロック1同士の間隙には砂利または砕石からなる中詰材2が充填してあり、この中詰材2の中央粒径を1cm以上とすることにより流水による中詰材の流亡を防止する。中詰材の充填高さは接地面から少なくとも消波ブロック1の重心高さまでとする。中詰材が消波ブロックの間隙を通過する水流の速度を抑制することによって消波ブロックの接地面の洗掘が防止される。【選択図】図1
SCOURING PREVENTION METHOD
洗掘防止方法
HATANO KESAYOSHI (Autor:in)
18.08.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
SCOURING PREVENTION STRUCTURE AND SCOURING PREVENTION METHOD
Europäisches Patentamt | 2022
|SCOURING PREVENTION BODY AND SCOURING PREVENTION METHOD
Europäisches Patentamt | 2023
|SCOURING PREVENTION MEMBER, INSTALLATION METHOD THEREOF, SCOURING PREVENTION METHOD
Europäisches Patentamt | 2024
|SCOURING PREVENTION UNIT AND SCOURING PREVENTION STRUCTURE
Europäisches Patentamt | 2022
|SCOURING PREVENTION STRUCTURE, AND CONSTRUCTION METHOD OF SCOURING PREVENTION STRUCTURE