Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To enhance workability in removal work for an extra-banking part formed while installing a concrete pile.SOLUTION: A pile head treatment device includes a removal bucket 20 for removing an extra-banking part D of a cast-in-place concrete pile, before the concrete hardens. The removal bucket 20 includes a conic plate 21, an annular plate 22, and a connection part 26, and is fitted on a kelly bar 11 that serves as a vertical motion rod. The removal bucket 20 is supported tiltably by a support pin 31 penetrating through the connection part 26. When the removal bucket 20 is pressed against the extra-banking part D, a swollen part E of the extra-banking part D is vibrated by a vibrator 39, and the extra-banking part D is fed into the removal bucket 20. The extra-banking part D fed into the removal bucket 20 is discharged outside, by tilting the removal bucket 20 around the support pin 31.SELECTED DRAWING: Figure 7
【課題】コンクリート杭の打設時に発生する余盛の除去処理作業の作業性を向上させる。【解決手段】杭頭処理装置は場所打ちコンクリート杭の余盛Dを硬化前に除去処理するために、除去バケット20を有する。除去バケット20は円錐板21と環状板22と連結部26とを備え、上下動ロッドとしてのケリーバ11に装着される。除去バケット20は連結部26を貫通する支持ピン31により傾動自在に支持される。除去バケット20が余盛Dに押し付けられたときに、余盛Dの盛り上がり部Eはバイブレーター39により振動され、余盛Dは除去バケット20内に供給される。除去バケット20内に供給された余盛Dは、支持ピン31を中心に除去バケット20を傾動させることにより、外部に排出される。【選択図】図7
PROBLEM TO BE SOLVED: To enhance workability in removal work for an extra-banking part formed while installing a concrete pile.SOLUTION: A pile head treatment device includes a removal bucket 20 for removing an extra-banking part D of a cast-in-place concrete pile, before the concrete hardens. The removal bucket 20 includes a conic plate 21, an annular plate 22, and a connection part 26, and is fitted on a kelly bar 11 that serves as a vertical motion rod. The removal bucket 20 is supported tiltably by a support pin 31 penetrating through the connection part 26. When the removal bucket 20 is pressed against the extra-banking part D, a swollen part E of the extra-banking part D is vibrated by a vibrator 39, and the extra-banking part D is fed into the removal bucket 20. The extra-banking part D fed into the removal bucket 20 is discharged outside, by tilting the removal bucket 20 around the support pin 31.SELECTED DRAWING: Figure 7
【課題】コンクリート杭の打設時に発生する余盛の除去処理作業の作業性を向上させる。【解決手段】杭頭処理装置は場所打ちコンクリート杭の余盛Dを硬化前に除去処理するために、除去バケット20を有する。除去バケット20は円錐板21と環状板22と連結部26とを備え、上下動ロッドとしてのケリーバ11に装着される。除去バケット20は連結部26を貫通する支持ピン31により傾動自在に支持される。除去バケット20が余盛Dに押し付けられたときに、余盛Dの盛り上がり部Eはバイブレーター39により振動され、余盛Dは除去バケット20内に供給される。除去バケット20内に供給された余盛Dは、支持ピン31を中心に除去バケット20を傾動させることにより、外部に排出される。【選択図】図7
PILE HEAD TREATMENT DEVICE
杭頭処理装置
HORIMOTO TOSHIHARU (Autor:in)
12.01.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE HEAD TREATMENT METHOD AND PILE HEAD BURIAL BAG USED FOR PILE HEAD TREATMENT
Europäisches Patentamt | 2015
|Bridge pile foundation pile head chiseling soft treatment device
Europäisches Patentamt | 2022
|PILE HEAD CONNECTION DEVICE, PILE HEAD CONNECTION STRUCTURE, AND PILE HEAD CONNECTION METHOD
Europäisches Patentamt | 2016
|