Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PILE CONSTRUCTION METHOD AND REVERSE EXCAVATION SYSTEM
PROBLEM TO BE SOLVED: To provide a pile construction method and a reverse construction method excavation system that are capable of reducing the amount of soil to be prepared for temporary backfilling of an upper space of a hole in which a pile is constructed.SOLUTION: A reverse excavation system comprises: an excavator capable of forming, in the ground, a hole in which a pile is constructed while leaving an upper space, by using a reverse construction method; and a slurry circulation system configured to supply slurry to a hole under excavation by the excavator and make slurry including sediment be discharged from the inside of the hole under excavation in order to reuse the slurry in the hole under excavation. The slurry circulation system includes at least one storage tank for temporarily storing the slurry including sediment discharged from the inside of the hole under excavation. At least one of the at least one storage tank is constituted by an upper space of another hole in which a pile is constructed.SELECTED DRAWING: Figure 1
【課題】杭が構築された孔の上部空間の一時的な埋め戻しのために用意する土を削減可能な杭構築方法、及び、リバース工法掘削システムを提供する。【解決手段】リバース掘削システムは、リバース工法により、上部空間を残して杭が構築される孔を地盤に形成可能な掘削機と、掘削機が掘削途中の孔に泥水を供給する一方、掘削途中の孔内の泥水を再利用するために、掘削途中の孔内から土砂を含む泥水を排出させるように構成された泥水循環系統とを備える。泥水循環系統は、掘削途中の孔内から排出された土砂を含む泥水を一時的に貯留する少なくとも1つの貯留槽を含み、少なくとも1つの貯留槽のうち少なくとも1つは、杭が構築された他の孔の上部空間によって構成されている。【選択図】 図1
PILE CONSTRUCTION METHOD AND REVERSE EXCAVATION SYSTEM
PROBLEM TO BE SOLVED: To provide a pile construction method and a reverse construction method excavation system that are capable of reducing the amount of soil to be prepared for temporary backfilling of an upper space of a hole in which a pile is constructed.SOLUTION: A reverse excavation system comprises: an excavator capable of forming, in the ground, a hole in which a pile is constructed while leaving an upper space, by using a reverse construction method; and a slurry circulation system configured to supply slurry to a hole under excavation by the excavator and make slurry including sediment be discharged from the inside of the hole under excavation in order to reuse the slurry in the hole under excavation. The slurry circulation system includes at least one storage tank for temporarily storing the slurry including sediment discharged from the inside of the hole under excavation. At least one of the at least one storage tank is constituted by an upper space of another hole in which a pile is constructed.SELECTED DRAWING: Figure 1
【課題】杭が構築された孔の上部空間の一時的な埋め戻しのために用意する土を削減可能な杭構築方法、及び、リバース工法掘削システムを提供する。【解決手段】リバース掘削システムは、リバース工法により、上部空間を残して杭が構築される孔を地盤に形成可能な掘削機と、掘削機が掘削途中の孔に泥水を供給する一方、掘削途中の孔内の泥水を再利用するために、掘削途中の孔内から土砂を含む泥水を排出させるように構成された泥水循環系統とを備える。泥水循環系統は、掘削途中の孔内から排出された土砂を含む泥水を一時的に貯留する少なくとも1つの貯留槽を含み、少なくとも1つの貯留槽のうち少なくとも1つは、杭が構築された他の孔の上部空間によって構成されている。【選択図】 図1
PILE CONSTRUCTION METHOD AND REVERSE EXCAVATION SYSTEM
杭構築方法及びリバース掘削システム
SUGAWARA NOBUYUKI (Autor:in) / AWANE TETSUJI (Autor:in) / INOUE TOSHIRO (Autor:in) / HASHIDATE KENJI (Autor:in)
20.04.2017
Patent
Elektronische Ressource
Japanisch
EXCAVATION METHOD OF PILE HOLE, PILE CONSTRUCTION METHOD, AND PILE
Europäisches Patentamt | 2024
|STEEL PIPE FOR INNER EXCAVATION PILE CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|METHOD FOR CONSTRUCTION MANAGEMENT OF PILE HOLE EXCAVATION
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2022
|