METHOD FOR CONSTRUCTION MANAGEMENT OF PILE HOLE EXCAVATION
PROBLEM TO BE SOLVED: To provide a method for construction management of a pile hole which enables a construction manager of pile foundation to surely and quickly grasp whether a pile hole reaches a bearing layer.SOLUTION: A method for construction management of a pile hole comprises: the index measurement step S1 of measuring an index corresponding to the resistance from a ground that acts on a drilling machine while excavating a pile hole by the drilling machine; the chart creation step S2 of creating a chart based on the index measured by the index measurement step S1; the photographing step S3 of acquiring a chart image by photographing a chart created in the chart creation step S2; and the image transmission step S4 of transmitting a chart image acquired in the photographing step S3 to a construction manager of pile foundation on a date when excavation of a pile hole is completed.SELECTED DRAWING: Figure 1
【課題】杭基礎の施工管理者が、杭孔が支持層に到達したか否かを確実且つ迅速に把握することが可能である、杭孔の施工管理方法を提供する。【解決手段】杭孔の施工管理方法は、掘削機によって杭孔を掘削しながら、掘削機に作用する地盤からの抵抗に対応する指標を測定する指標測定工程S1と、指標測定工程S1にて測定された指標に基づいてチャートを作成するチャート作成工程S2と、チャート作成工程S2にて作成されたチャートを撮影してチャートの画像を取得する撮影工程S3と、撮影工程S3にて得られたチャートの画像を、杭孔の掘削が完了した日に杭基礎の施工管理者に送る画像送付工程S4とを有する。【選択図】図1
METHOD FOR CONSTRUCTION MANAGEMENT OF PILE HOLE EXCAVATION
PROBLEM TO BE SOLVED: To provide a method for construction management of a pile hole which enables a construction manager of pile foundation to surely and quickly grasp whether a pile hole reaches a bearing layer.SOLUTION: A method for construction management of a pile hole comprises: the index measurement step S1 of measuring an index corresponding to the resistance from a ground that acts on a drilling machine while excavating a pile hole by the drilling machine; the chart creation step S2 of creating a chart based on the index measured by the index measurement step S1; the photographing step S3 of acquiring a chart image by photographing a chart created in the chart creation step S2; and the image transmission step S4 of transmitting a chart image acquired in the photographing step S3 to a construction manager of pile foundation on a date when excavation of a pile hole is completed.SELECTED DRAWING: Figure 1
【課題】杭基礎の施工管理者が、杭孔が支持層に到達したか否かを確実且つ迅速に把握することが可能である、杭孔の施工管理方法を提供する。【解決手段】杭孔の施工管理方法は、掘削機によって杭孔を掘削しながら、掘削機に作用する地盤からの抵抗に対応する指標を測定する指標測定工程S1と、指標測定工程S1にて測定された指標に基づいてチャートを作成するチャート作成工程S2と、チャート作成工程S2にて作成されたチャートを撮影してチャートの画像を取得する撮影工程S3と、撮影工程S3にて得られたチャートの画像を、杭孔の掘削が完了した日に杭基礎の施工管理者に送る画像送付工程S4とを有する。【選択図】図1
METHOD FOR CONSTRUCTION MANAGEMENT OF PILE HOLE EXCAVATION
杭孔掘削の施工管理方法
INOUE TOSHIRO (Autor:in) / SUMI KOJI (Autor:in) / HOSODA MITSUYOSHI (Autor:in)
16.11.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
EXCAVATION METHOD OF PILE HOLE, PILE CONSTRUCTION METHOD, AND PILE
Europäisches Patentamt | 2024
|EXCAVATION ROD, EXCAVATION HEAD AND PILE-HOLE EXCAVATION DEVICE
Europäisches Patentamt | 2019
|