Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BUILDING FLOOR STRUCTURE
PROBLEM TO BE SOLVED: To provide a building floor structure which inhibits a separation plate in a horizontal direction arranged at a point which is necessary for the system separation of a cable under a floor from coming off at vibration in a vertical direction, and can remove the separation plate if necessary, and possesses safety and convenience.SOLUTION: This building floor structure comprises a concrete beam, a steel beam, a horizontal separation plate, and an energization mechanism. The concrete beam forms a groove for laying a cable. The steel beam has an upper flange and a lower flange opposing the upper flange, and is arranged so as to straddle the groove on the concrete beam. The horizontal separation plate is arranged at an opening of the groove. The horizontal separation plate has one side placed on the lower flange. The energization mechanism applies pressure to the upper flange and the horizontal separation plate.SELECTED DRAWING: Figure 1
【課題】床下においてケーブルの系統分離が必要な箇所に設ける水平方向の分離板を、垂直方向の振動では外れず、かつ必要に応じて取り外すことができる安全性と利便性を兼ね備えた建屋床構造を提供する。【解決手段】実施形態の建屋建屋床構造は、コンクリート梁、鉄鋼梁、水平分離板および付勢機構を備える。コンクリート梁はケーブルを布設するための溝を形成している。鉄鋼梁は上部フランジとこの上部フランジに対向する下部フランジとを有し、コンクリート梁の上に溝を跨ぐように設けられている。水平分離板は溝の開口に配置されている。水平分離板は下部フランジに載置される一辺を有する。付勢機構は上部フランジと水平分離板とに圧力を印加する。【選択図】図1
BUILDING FLOOR STRUCTURE
PROBLEM TO BE SOLVED: To provide a building floor structure which inhibits a separation plate in a horizontal direction arranged at a point which is necessary for the system separation of a cable under a floor from coming off at vibration in a vertical direction, and can remove the separation plate if necessary, and possesses safety and convenience.SOLUTION: This building floor structure comprises a concrete beam, a steel beam, a horizontal separation plate, and an energization mechanism. The concrete beam forms a groove for laying a cable. The steel beam has an upper flange and a lower flange opposing the upper flange, and is arranged so as to straddle the groove on the concrete beam. The horizontal separation plate is arranged at an opening of the groove. The horizontal separation plate has one side placed on the lower flange. The energization mechanism applies pressure to the upper flange and the horizontal separation plate.SELECTED DRAWING: Figure 1
【課題】床下においてケーブルの系統分離が必要な箇所に設ける水平方向の分離板を、垂直方向の振動では外れず、かつ必要に応じて取り外すことができる安全性と利便性を兼ね備えた建屋床構造を提供する。【解決手段】実施形態の建屋建屋床構造は、コンクリート梁、鉄鋼梁、水平分離板および付勢機構を備える。コンクリート梁はケーブルを布設するための溝を形成している。鉄鋼梁は上部フランジとこの上部フランジに対向する下部フランジとを有し、コンクリート梁の上に溝を跨ぐように設けられている。水平分離板は溝の開口に配置されている。水平分離板は下部フランジに載置される一辺を有する。付勢機構は上部フランジと水平分離板とに圧力を印加する。【選択図】図1
BUILDING FLOOR STRUCTURE
建屋床構造
SATO YOSHIMI (Autor:in) / OYA TAKAHIRO (Autor:in) / HOSOYA SATOSHI (Autor:in) / TAMURA RYOTA (Autor:in)
02.11.2017
Patent
Elektronische Ressource
Japanisch
Floor structure of fabricated building and building with floor structure
Europäisches Patentamt | 2022
|