Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION MANAGEMENT METHOD OF PILE, CONSTRUCTION MANAGEMENT PROGRAM, AND CONSTRUCTION MANAGEMENT DEVICE
PROBLEM TO BE SOLVED: To provide a construction management method of a pile which can determine whether or not duplication exists in construction management data of a plie which are submitted to a construction manager of the pile, or in the submitted construction management data, a construction management program, and a construction management device.SOLUTION: A construction management method of a pile has: a construction management data preparation process for preparing construction management data which are acquired at respective piles when constructing a plurality of the piles, and a determination process for determining whether or not there are data which coincide with each other between the construction management data which are prepared in the construction management data preparation process.SELECTED DRAWING: Figure 1
【課題】杭の施工管理者に提出される杭の施工管理データ、或いは、提出された杭の施工管理データに重複があるか否かを判断可能な杭の施工管理方法、施工管理プログラム、及び施工管理装置を提供することにある。【解決手段】杭の施工管理方法は、複数の杭を構築する際に複数の杭毎に取得された施工管理データを用意する施工管理データ用意工程と、施工管理データ用意工程で用意された施工管理データの間に、相互に一致するものがあるか否かを判定する判定工程とを有する。【選択図】 図1
CONSTRUCTION MANAGEMENT METHOD OF PILE, CONSTRUCTION MANAGEMENT PROGRAM, AND CONSTRUCTION MANAGEMENT DEVICE
PROBLEM TO BE SOLVED: To provide a construction management method of a pile which can determine whether or not duplication exists in construction management data of a plie which are submitted to a construction manager of the pile, or in the submitted construction management data, a construction management program, and a construction management device.SOLUTION: A construction management method of a pile has: a construction management data preparation process for preparing construction management data which are acquired at respective piles when constructing a plurality of the piles, and a determination process for determining whether or not there are data which coincide with each other between the construction management data which are prepared in the construction management data preparation process.SELECTED DRAWING: Figure 1
【課題】杭の施工管理者に提出される杭の施工管理データ、或いは、提出された杭の施工管理データに重複があるか否かを判断可能な杭の施工管理方法、施工管理プログラム、及び施工管理装置を提供することにある。【解決手段】杭の施工管理方法は、複数の杭を構築する際に複数の杭毎に取得された施工管理データを用意する施工管理データ用意工程と、施工管理データ用意工程で用意された施工管理データの間に、相互に一致するものがあるか否かを判定する判定工程とを有する。【選択図】 図1
CONSTRUCTION MANAGEMENT METHOD OF PILE, CONSTRUCTION MANAGEMENT PROGRAM, AND CONSTRUCTION MANAGEMENT DEVICE
杭の施工管理方法、施工管理プログラム、及び、施工管理装置
YANO MITSUTOSHI (Autor:in)
08.02.2018
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2020
|PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM
Europäisches Patentamt | 2019
|CONSTRUCTION MANAGEMENT SYSTEM OF PILE AND CONSTRUCTION MANAGEMENT METHOD
Europäisches Patentamt | 2018
|