SLUDGE SCRAPING METHOD
PROBLEM TO BE SOLVED: To surely prevent the falling of a flight without the complication of a structure, the complication of a replacement work and cost increase.SOLUTION: In a sludge scraping method,: a flight 4 scraping sludge stacked on the bottom surface of a sludge precipitation pond P is attached to a chain 3 being disposed so as to be endlessly wound in the sludge precipitation pond P and travelling so as to go around and a sludge scraping body 5 is constituted; recessed grooves 4a respectively penetrating the flight 4 in a travelling direction of the sludge scraper body 5 and opening at both end surfaces of the flight 4 are formed at both ends of the flight 4 in a longitudinal direction of the flight 4 crossing in a travelling direction of the sludge scraper body 5; a pair of support rails 11 being disposed in the sludge precipitation pond P and extending in a travelling direction are respectively inserted into the recessed grooves 4a; and the flight 4 travels while at least one of a pair of mutually facing groove wall surfaces of the recessed grooves 4a makes slide contact with the support rail 11.SELECTED DRAWING: Figure 4
【課題】構造の複雑化や交換作業の煩雑化、コスト増大を招くことなく、フライトの脱落を確実に防止する。【解決手段】汚泥沈殿池P内に無端状に巻回されるように配設されて周回走行させられるチェーン3に、汚泥沈殿池Pの底面に堆積した汚泥を掻き寄せるフライト4が取り付けられて汚泥掻寄体5が構成され、この汚泥掻寄体5の走行方向に交差するフライト4の長手方向におけるフライト4の両端部には、汚泥掻寄体5の走行方向にフライト4を貫通してフライト4の両端面に開口するそれぞれ凹溝4aが形成されており、これらの凹溝4aには、汚泥沈殿池P内に設置されて走行方向に延びる一対の支持レール11がそれぞれ挿入されていて、フライト4は、凹溝4aの互いに対向する一対の溝壁面の少なくとも一方が支持レール11に摺接しながら走行する。【選択図】図4
SLUDGE SCRAPING METHOD
PROBLEM TO BE SOLVED: To surely prevent the falling of a flight without the complication of a structure, the complication of a replacement work and cost increase.SOLUTION: In a sludge scraping method,: a flight 4 scraping sludge stacked on the bottom surface of a sludge precipitation pond P is attached to a chain 3 being disposed so as to be endlessly wound in the sludge precipitation pond P and travelling so as to go around and a sludge scraping body 5 is constituted; recessed grooves 4a respectively penetrating the flight 4 in a travelling direction of the sludge scraper body 5 and opening at both end surfaces of the flight 4 are formed at both ends of the flight 4 in a longitudinal direction of the flight 4 crossing in a travelling direction of the sludge scraper body 5; a pair of support rails 11 being disposed in the sludge precipitation pond P and extending in a travelling direction are respectively inserted into the recessed grooves 4a; and the flight 4 travels while at least one of a pair of mutually facing groove wall surfaces of the recessed grooves 4a makes slide contact with the support rail 11.SELECTED DRAWING: Figure 4
【課題】構造の複雑化や交換作業の煩雑化、コスト増大を招くことなく、フライトの脱落を確実に防止する。【解決手段】汚泥沈殿池P内に無端状に巻回されるように配設されて周回走行させられるチェーン3に、汚泥沈殿池Pの底面に堆積した汚泥を掻き寄せるフライト4が取り付けられて汚泥掻寄体5が構成され、この汚泥掻寄体5の走行方向に交差するフライト4の長手方向におけるフライト4の両端部には、汚泥掻寄体5の走行方向にフライト4を貫通してフライト4の両端面に開口するそれぞれ凹溝4aが形成されており、これらの凹溝4aには、汚泥沈殿池P内に設置されて走行方向に延びる一対の支持レール11がそれぞれ挿入されていて、フライト4は、凹溝4aの互いに対向する一対の溝壁面の少なくとも一方が支持レール11に摺接しながら走行する。【選択図】図4
SLUDGE SCRAPING METHOD
汚泥掻寄方法
NOSE KAZUHIRO (Autor:in) / KOYAMA TATSUYA (Autor:in)