METHOD FOR CONSTRUCTING STRUCTURE
PROBLEM TO BE SOLVED: To shorten a construction period of a structure.SOLUTION: A method for constructing a structure includes: a frame construction step of constructing a frame 50 having a pair of preceding columns 52 and a beam 58 supported by the pair of preceding columns 52; and a post-construction column construction step of constructing a post-construction column 54 supporting the beam 58 adjacent to the preceding column 52.SELECTED DRAWING: Figure 4
【課題】本発明は、構造物の工期を短縮することを目的とする。【解決手段】構造物の施工方法は、一対の先行柱52と、一対の先行柱52に支持される梁58と、を有する架構50を施工する架構施工工程と、先行柱52の隣に、梁58を支持する後施工柱54を施工する後施工柱施工工程と、を備える。【選択図】図4
METHOD FOR CONSTRUCTING STRUCTURE
PROBLEM TO BE SOLVED: To shorten a construction period of a structure.SOLUTION: A method for constructing a structure includes: a frame construction step of constructing a frame 50 having a pair of preceding columns 52 and a beam 58 supported by the pair of preceding columns 52; and a post-construction column construction step of constructing a post-construction column 54 supporting the beam 58 adjacent to the preceding column 52.SELECTED DRAWING: Figure 4
【課題】本発明は、構造物の工期を短縮することを目的とする。【解決手段】構造物の施工方法は、一対の先行柱52と、一対の先行柱52に支持される梁58と、を有する架構50を施工する架構施工工程と、先行柱52の隣に、梁58を支持する後施工柱54を施工する後施工柱施工工程と、を備える。【選択図】図4
METHOD FOR CONSTRUCTING STRUCTURE
構造物の施工方法