POST-INSTALLED ANCHOR AND INSTALLATION STRUCTURE THEREOF
To provide a post-installed anchor that has a high anchorage force to prevent the anchor from being removed from concrete and can be easily removed when unnecessary.SOLUTION: A post-installed anchor 1 has: an inner member 2 having a taper portion 22 whose diameter increases gradually toward a front end on a front end side of a base 21; and a sleeve 3 having an extension piece 33 to be extended by entering of the taper portion 22 on a front side. A female screw hole 24 opening at a rear end surface 23 is provided on the inner member 2. A fitting bolt 4 can be screwed into the female screw hole 24. A spacer 5 extending in an axial direction is slidably inserted in an insertion hole 26 opening at a front end surface 25 of the inner member 2, and partially protrudes from the insertion hole 26 to the front end side.SELECTED DRAWING: Figure 3
【課題】高い定着力を有し、コンクリートからの抜け出しを防止することができると共に、不要時に容易に撤去することができるあと施工アンカーを提供する。【解決手段】基部21の先端側に先端に向かって漸次拡径するテーパ部22が設けられているインナー部材2と、先端側にテーパ部22の入り込みで拡張する拡張片33が設けられているスリーブ3を備え、インナー部材2に後端面23で開口する雌ねじ穴24が設けられ、雌ねじ穴24に取付ボルト4を螺合可能であると共に、インナー部材2の先端面25で開口する挿入穴26に軸方向に延びるスペーサー5がスライド可能に挿入され、その一部が挿入穴26から先端側に突出して設けられているあと施工アンカー1。【選択図】図3
POST-INSTALLED ANCHOR AND INSTALLATION STRUCTURE THEREOF
To provide a post-installed anchor that has a high anchorage force to prevent the anchor from being removed from concrete and can be easily removed when unnecessary.SOLUTION: A post-installed anchor 1 has: an inner member 2 having a taper portion 22 whose diameter increases gradually toward a front end on a front end side of a base 21; and a sleeve 3 having an extension piece 33 to be extended by entering of the taper portion 22 on a front side. A female screw hole 24 opening at a rear end surface 23 is provided on the inner member 2. A fitting bolt 4 can be screwed into the female screw hole 24. A spacer 5 extending in an axial direction is slidably inserted in an insertion hole 26 opening at a front end surface 25 of the inner member 2, and partially protrudes from the insertion hole 26 to the front end side.SELECTED DRAWING: Figure 3
【課題】高い定着力を有し、コンクリートからの抜け出しを防止することができると共に、不要時に容易に撤去することができるあと施工アンカーを提供する。【解決手段】基部21の先端側に先端に向かって漸次拡径するテーパ部22が設けられているインナー部材2と、先端側にテーパ部22の入り込みで拡張する拡張片33が設けられているスリーブ3を備え、インナー部材2に後端面23で開口する雌ねじ穴24が設けられ、雌ねじ穴24に取付ボルト4を螺合可能であると共に、インナー部材2の先端面25で開口する挿入穴26に軸方向に延びるスペーサー5がスライド可能に挿入され、その一部が挿入穴26から先端側に突出して設けられているあと施工アンカー1。【選択図】図3
POST-INSTALLED ANCHOR AND INSTALLATION STRUCTURE THEREOF
あと施工アンカー及びその設置構造
JOGAN MASAHIKO (Autor:in) / KUBOTA YOICHI (Autor:in) / TANIGUCHI HIROSHI (Autor:in)
17.09.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
POST-INSTALLED ANCHOR, INSTALLATION METHOD THEREOF AND POST-INSTALLED ANCHOR SYSTEM
Europäisches Patentamt | 2016
|POST-INSTALLED ANCHOR AND INSTALLATION STRUCTURE THEREOF
Europäisches Patentamt | 2020
|POST-INSTALLED ANCHOR, POST-INSTALLED ANCHOR CONSTRUCTION METHOD, AND POST-INSTALLED ANCHOR SYSTEM
Europäisches Patentamt | 2016
|FASTENING STRUCTURE AND INSTALLATION METHOD OF POST-INSTALLED ANCHOR