Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WALL CONSTRUCTION METHOD AND WALL
To provide a wall construction method which can easily fix a face material even when a stud is arranged in the vicinity of a column.SOLUTION: A wall construction method includes: a first hole part formation step of forming a rear side through hole 23b at the rear side of a first stud 20A; a second hole part formation step of forming a surface side through hole 22b at the surface side of the first stud 20A; a third hole part formation step of forming a through hole 31 at a first gypsum board 30 so as to be communicated with the surface side through hole 22b; a set step of setting a first screw 40 for fixing the first gypsum board 30 to the first stud 20A from the through hole 31; and a first face material fixation step of inserting the first screw 40 into the surface side through hole 22b and the through hole 31 by drawing the first screw 40 from the surface side through hole 22b by utilizing the rear side through hole 23b to fix the first gypsum board 30.SELECTED DRAWING: Figure 9
【課題】柱の近傍にスタッドが配置される場合でも、面材を容易に固定することが可能な壁の施工方法を提供する。【解決手段】第1スタッド20Aの裏側に裏側貫通孔23bを形成する第1孔部形成工程と、第1スタッド20Aの表側に表側貫通孔22bを形成する第2孔部形成工程と、表側貫通孔22bと連通するように第1石膏ボード30に貫通孔31を形成する第3孔部形成工程と、第1石膏ボード30を第1スタッド20Aに固定するための第1ビス40を貫通孔31からセットするセット工程と、裏側貫通孔23bを利用して第1ビス40を表側貫通孔22bから引き寄せることで、表側貫通孔22b及び貫通孔31に第1ビス40を差し込んで、第1石膏ボード30を固定する第1面材固定工程と、を具備する。【選択図】図9
WALL CONSTRUCTION METHOD AND WALL
To provide a wall construction method which can easily fix a face material even when a stud is arranged in the vicinity of a column.SOLUTION: A wall construction method includes: a first hole part formation step of forming a rear side through hole 23b at the rear side of a first stud 20A; a second hole part formation step of forming a surface side through hole 22b at the surface side of the first stud 20A; a third hole part formation step of forming a through hole 31 at a first gypsum board 30 so as to be communicated with the surface side through hole 22b; a set step of setting a first screw 40 for fixing the first gypsum board 30 to the first stud 20A from the through hole 31; and a first face material fixation step of inserting the first screw 40 into the surface side through hole 22b and the through hole 31 by drawing the first screw 40 from the surface side through hole 22b by utilizing the rear side through hole 23b to fix the first gypsum board 30.SELECTED DRAWING: Figure 9
【課題】柱の近傍にスタッドが配置される場合でも、面材を容易に固定することが可能な壁の施工方法を提供する。【解決手段】第1スタッド20Aの裏側に裏側貫通孔23bを形成する第1孔部形成工程と、第1スタッド20Aの表側に表側貫通孔22bを形成する第2孔部形成工程と、表側貫通孔22bと連通するように第1石膏ボード30に貫通孔31を形成する第3孔部形成工程と、第1石膏ボード30を第1スタッド20Aに固定するための第1ビス40を貫通孔31からセットするセット工程と、裏側貫通孔23bを利用して第1ビス40を表側貫通孔22bから引き寄せることで、表側貫通孔22b及び貫通孔31に第1ビス40を差し込んで、第1石膏ボード30を固定する第1面材固定工程と、を具備する。【選択図】図9
WALL CONSTRUCTION METHOD AND WALL
壁の施工方法及び壁
MOMOKAWA MISA (Autor:in) / ARIMA FUYUKI (Autor:in)
11.10.2024
Patent
Elektronische Ressource
Japanisch
WALL CONSTRUCTION METHOD AND WALL CONSTRUCTION STRUCTURE
Europäisches Patentamt | 2019
|Wall supporting assembly, wall and construction method of wall
Europäisches Patentamt | 2020
|