Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SLAB TRACK CONSTRUCTION METHOD
To provide a slab track construction method which, during the slab track construction, prevents roadbed concrete from getting dirty and makes it easy to install the track slabs at a constant height.SOLUTION: A grouting bag for slab track construction, which includes a grouting bag body 1 and a grouting port 2, is prepared. The grouting bag body 1 is made of laminated nonwoven fabric. The grouting port 2 is made of woven or knitted fabric with higher tensile strength than the laminated nonwoven fabric. The laminated nonwoven fabric is formed by laminating and bonding, on both sides of ultrafine fiber nonwoven fabric formed by accumulating thermoplastic ultrafine fibers, long fiber nonwoven fabric formed by accumulating thermoplastic long fibers with a finer diameter than the thermoplastic ultrafine fibers. The grouting bag for slab track construction is inserted between the concrete or the roadbed concrete laid on it and the track slab, or between the locking protrusions installed on the concrete slab or the roadbed concrete laid on it and the track slab. Then, the slab track is constructed by pressure-feeding and injecting filling materials from the grouting port 2.SELECTED DRAWING: Figure 2
【課題】 スラブ軌道築造の際に、路盤コンクリートの汚れを防止すると共に、軌道スラブを一定高さに設置しやすいようにするためのスラブ軌道の築造方法を提供する。【解決手段】 注入袋本体1と注入口2とを備えているスラブ軌道築造用注入袋を準備する。注入袋本体1は積層不織布で構成されている。注入口2は積層不織布よりも引張強度の高い織物又は編物で構成されている。積層不織布は、熱可塑性極細繊維が集積されてなる極細繊維不織布の両面に、熱可塑性極細繊維よりも高繊度の熱可塑性長繊維が集積されてなる長繊維不織布が積層接合されてなる。コンクリート又はその上に設けた路盤コンクリートと軌道スラブの間に、又はコンクリート床版又はその上に設けた路盤コンクリート上に設置した係止突起と軌道スラブの間に、スラブ軌道築造用注入袋を挿入する。そして、注入口2から充填材を圧送注入することにより、スラブ軌道を築造する。【選択図】図2
SLAB TRACK CONSTRUCTION METHOD
To provide a slab track construction method which, during the slab track construction, prevents roadbed concrete from getting dirty and makes it easy to install the track slabs at a constant height.SOLUTION: A grouting bag for slab track construction, which includes a grouting bag body 1 and a grouting port 2, is prepared. The grouting bag body 1 is made of laminated nonwoven fabric. The grouting port 2 is made of woven or knitted fabric with higher tensile strength than the laminated nonwoven fabric. The laminated nonwoven fabric is formed by laminating and bonding, on both sides of ultrafine fiber nonwoven fabric formed by accumulating thermoplastic ultrafine fibers, long fiber nonwoven fabric formed by accumulating thermoplastic long fibers with a finer diameter than the thermoplastic ultrafine fibers. The grouting bag for slab track construction is inserted between the concrete or the roadbed concrete laid on it and the track slab, or between the locking protrusions installed on the concrete slab or the roadbed concrete laid on it and the track slab. Then, the slab track is constructed by pressure-feeding and injecting filling materials from the grouting port 2.SELECTED DRAWING: Figure 2
【課題】 スラブ軌道築造の際に、路盤コンクリートの汚れを防止すると共に、軌道スラブを一定高さに設置しやすいようにするためのスラブ軌道の築造方法を提供する。【解決手段】 注入袋本体1と注入口2とを備えているスラブ軌道築造用注入袋を準備する。注入袋本体1は積層不織布で構成されている。注入口2は積層不織布よりも引張強度の高い織物又は編物で構成されている。積層不織布は、熱可塑性極細繊維が集積されてなる極細繊維不織布の両面に、熱可塑性極細繊維よりも高繊度の熱可塑性長繊維が集積されてなる長繊維不織布が積層接合されてなる。コンクリート又はその上に設けた路盤コンクリートと軌道スラブの間に、又はコンクリート床版又はその上に設けた路盤コンクリート上に設置した係止突起と軌道スラブの間に、スラブ軌道築造用注入袋を挿入する。そして、注入口2から充填材を圧送注入することにより、スラブ軌道を築造する。【選択図】図2
SLAB TRACK CONSTRUCTION METHOD
スラブ軌道の築造方法
ONO TETSUO (Autor:in) / MIYAGAWA YUKIHISA (Autor:in) / KOIKE TOSHIYUKI (Autor:in) / TANAKA TOSHIHARU (Autor:in) / EZAKI KOJI (Autor:in)
11.10.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
SLAB TRACK CONSTRUCTION INJECTION BAG AND SLAB TRACK STRUCTURE
Europäisches Patentamt | 2021
|Steel spring floating slab prefabricated slab track construction method
Europäisches Patentamt | 2023
|