TRUSS AND TRUSS CONSTRUCTION METHOD
SOLUTION: This invention provides a truss and a truss construction method. The truss includes a lower chord, a vertical member 106, a truss module 205 and a second diagonal member, the truss module 205 includes an upper chord 206 and a first diagonal member 104, one end of the upper chord 206 is connected to the upper end of the first diagonal member 104, the upper chord 206 and the first diagonal member 104 form an acute angle, multiple upper chords 206 jointly constitute an upper chord, the first diagonal member and the second diagonal member are alternately installed between the upper chord and the lower chord in the horizontal direction; the truss construction method includes a step to attach the lower chord to the top of a support 101, a step to connect the bottom of the vertical member 106 to the start end of the lower chord, and a step to attach the truss module 205 and the second diagonal member alternately to the lower chord in the direction from the start end to the finish end of the lower chord.EFFECT: The truss construction method according to the present invention can reduce the number of trusses required for construction, thereby improving ease of truss construction and reducing truss construction costs.SELECTED DRAWING: Figure 6
【解決手段】本発明は、トラス及びトラス施工方法を提供する。トラスは下弦材、垂直材106、トラスモジュール205及び第2斜材を含み、トラスモジュール205は上弦部206及び第1斜材104を含み、上弦部206の一端は第1斜材104の上端に接続され、上弦部206と第1斜材104との夾角は鋭角であり、複数の上弦部206は共同で上弦材を構成し、第1斜材と第2斜材は水平方向に上弦材と下弦材との間に交互に設置され、トラス施工方法は、下弦材を支保工101の上部に取り付けるステップと、垂直材106の底部を下弦材の始端と接続するステップと、下弦材の始端から終端までの方向において、下弦材にトラスモジュール205と第2斜材を交互に取り付けるステップと、を含む。【効果】本発明のトラス施工方法は、施工に必要なトラスの数を低減させ、それによってトラスの施工容易性を向上させ、トラスの施工コストを削減することができる。【選択図】図6
TRUSS AND TRUSS CONSTRUCTION METHOD
SOLUTION: This invention provides a truss and a truss construction method. The truss includes a lower chord, a vertical member 106, a truss module 205 and a second diagonal member, the truss module 205 includes an upper chord 206 and a first diagonal member 104, one end of the upper chord 206 is connected to the upper end of the first diagonal member 104, the upper chord 206 and the first diagonal member 104 form an acute angle, multiple upper chords 206 jointly constitute an upper chord, the first diagonal member and the second diagonal member are alternately installed between the upper chord and the lower chord in the horizontal direction; the truss construction method includes a step to attach the lower chord to the top of a support 101, a step to connect the bottom of the vertical member 106 to the start end of the lower chord, and a step to attach the truss module 205 and the second diagonal member alternately to the lower chord in the direction from the start end to the finish end of the lower chord.EFFECT: The truss construction method according to the present invention can reduce the number of trusses required for construction, thereby improving ease of truss construction and reducing truss construction costs.SELECTED DRAWING: Figure 6
【解決手段】本発明は、トラス及びトラス施工方法を提供する。トラスは下弦材、垂直材106、トラスモジュール205及び第2斜材を含み、トラスモジュール205は上弦部206及び第1斜材104を含み、上弦部206の一端は第1斜材104の上端に接続され、上弦部206と第1斜材104との夾角は鋭角であり、複数の上弦部206は共同で上弦材を構成し、第1斜材と第2斜材は水平方向に上弦材と下弦材との間に交互に設置され、トラス施工方法は、下弦材を支保工101の上部に取り付けるステップと、垂直材106の底部を下弦材の始端と接続するステップと、下弦材の始端から終端までの方向において、下弦材にトラスモジュール205と第2斜材を交互に取り付けるステップと、を含む。【効果】本発明のトラス施工方法は、施工に必要なトラスの数を低減させ、それによってトラスの施工容易性を向上させ、トラスの施工コストを削減することができる。【選択図】図6
TRUSS AND TRUSS CONSTRUCTION METHOD
トラス及びトラス施工方法
RAO JIAYUAN (Autor:in) / ZHANG BIAO (Autor:in) / LIU HUANYUN (Autor:in) / ZHANG KAI (Autor:in) / DONG JING (Autor:in) / XIANG CHENG (Autor:in)
25.10.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Cantilever truss platform and cantilever truss construction method
Europäisches Patentamt | 2023
|Inclined truss node and truss node construction method
Europäisches Patentamt | 2023
|Large-span pipe truss whole-truss mounting construction method
Europäisches Patentamt | 2020
|Large-span pipe truss roof truss assembling construction method
Europäisches Patentamt | 2021
|