Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
DECK ROAD AND CONSTRUCTION METHOD OF DECK ROAD
The present invention relates to an upper board structure of a deck road and a construction method thereof capable of constructing an upper board structure more quickly by fixing an upper board fixing member on upper portions of beams on both sides one at a time and connecting upper board fixing members by inserting an upper board connecting member between the upper board fixing members. The upper board structure of a deck road according to the present invention is installed on upper portions of beams on both sides of a deck road disposed in parallel with each other in a front/rear direction and comprises: a plurality of upper board fixing members disposed on the upper portions of the beams on both sides in a transverse direction at regular intervals in the front/rear direction, whose both sides are fixed on the beams on both sides, and provided with connecting insertion recesses formed on a front and a rear of both sides thereof; and a plurality of upper board connecting members disposed between the upper board fixing members, whose both sides are placed on the upper portions of the beams on both sides, and provided with insertion protrusions formed on a front and a rear of both sides thereof and inserted into the connecting insertion recesses of the upper board fixing members.
본 발명은 양측 빔의 상부에 고정 상판부재를 하나씩 고정하면서 고정 상판부재들의 사이에 연결 상판부재를 끼움 조립만을 통해 연결시킴으로써 상판구조를 좀 더 신속하게 시공할 수 있도록 하는 데크로드의 상판구조 및 그 상판구조 시공방법에 관한 것으로, 본 발명에 따른 데크로드의 상판구조는 양측에 나란하게 전후 방향으로 위치되는 데크로드의 양측 빔 사이의 상부에 시공되는 상판구조에 있어서, 상기 상판구조는, 상기 양측 빔의 상부에 전,후방의 간격을 두면서 횡방향으로 배치되고, 양측이 상기 양측 빔에 고정되며, 양측의 전,후방에는 연결 삽입홈이 형성되는 다수의 고정 상판부재와; 상기 고정 상판부재들의 사이에 횡방향으로 배치되고, 양측이 상기 양측 빔의 상부에 올려지며, 양측의 전,후방에는 상기 고정 상판부재의 연결 삽입홈에 삽입 연결되는 삽입 돌출부가 형성되는 다수의 연결 상판부재;를 포함하는 것을 특징으로 한다.
DECK ROAD AND CONSTRUCTION METHOD OF DECK ROAD
The present invention relates to an upper board structure of a deck road and a construction method thereof capable of constructing an upper board structure more quickly by fixing an upper board fixing member on upper portions of beams on both sides one at a time and connecting upper board fixing members by inserting an upper board connecting member between the upper board fixing members. The upper board structure of a deck road according to the present invention is installed on upper portions of beams on both sides of a deck road disposed in parallel with each other in a front/rear direction and comprises: a plurality of upper board fixing members disposed on the upper portions of the beams on both sides in a transverse direction at regular intervals in the front/rear direction, whose both sides are fixed on the beams on both sides, and provided with connecting insertion recesses formed on a front and a rear of both sides thereof; and a plurality of upper board connecting members disposed between the upper board fixing members, whose both sides are placed on the upper portions of the beams on both sides, and provided with insertion protrusions formed on a front and a rear of both sides thereof and inserted into the connecting insertion recesses of the upper board fixing members.
본 발명은 양측 빔의 상부에 고정 상판부재를 하나씩 고정하면서 고정 상판부재들의 사이에 연결 상판부재를 끼움 조립만을 통해 연결시킴으로써 상판구조를 좀 더 신속하게 시공할 수 있도록 하는 데크로드의 상판구조 및 그 상판구조 시공방법에 관한 것으로, 본 발명에 따른 데크로드의 상판구조는 양측에 나란하게 전후 방향으로 위치되는 데크로드의 양측 빔 사이의 상부에 시공되는 상판구조에 있어서, 상기 상판구조는, 상기 양측 빔의 상부에 전,후방의 간격을 두면서 횡방향으로 배치되고, 양측이 상기 양측 빔에 고정되며, 양측의 전,후방에는 연결 삽입홈이 형성되는 다수의 고정 상판부재와; 상기 고정 상판부재들의 사이에 횡방향으로 배치되고, 양측이 상기 양측 빔의 상부에 올려지며, 양측의 전,후방에는 상기 고정 상판부재의 연결 삽입홈에 삽입 연결되는 삽입 돌출부가 형성되는 다수의 연결 상판부재;를 포함하는 것을 특징으로 한다.
DECK ROAD AND CONSTRUCTION METHOD OF DECK ROAD
데크로드의 상판구조 및 그 상판구조 시공방법
BAE GYU MAN (Autor:in)
16.07.2015
Patent
Elektronische Ressource
Koreanisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Construction method of deck road and deck road thereof
Europäisches Patentamt | 2023
|ROAD BRIDGE INSPECTION DECK AND ROAD BRIDGE INSPECTION DECK CONSTRUCTION METHOD
Europäisches Patentamt | 2019
|