Construction method of deck road and deck road thereof
The present invention provides a deck road construction method and a deck road constructed thereby. The deck road construction method comprises: a step of installing each of first-1 and first-2 cantilever parts; a step of installing a first support pipe; a step of preparing a trolley part; a step of advancing and fixing the trolley part to move the trolley part forward to a predetermined distance; a step of lowering a work board (55) of the trolley part; a step of installing and fixing a first-3 cantilever part; a step of separating the trolley part; a step of moving the trolley part backward; a step of raising the work board of the trolley part; a step of sequentially installing the cantilever parts; a step of installing a second-1 cantilever part; a step of installing a second support pipe; a step of installing a second-2 cantilever part and sequentially installing cantilever parts; and after completion of the step of sequentially installing the support pipes and the step of sequentially installing the cantilever parts, a step of recovering the trolley part; and a step of installing stepping decks (60) on the upper surface of the support pipes fixed to each cantilever part according to first, second, and subsequent orders. Therefore, the deck road construction method can significantly reduce construction duration and costs.
본 발명은, 제1-1, 1-2컨틸레버부 각각의 설치단계; 제1차 지지강관 설치단계; 대차부 준비단계; 대차부를 전방으로 일정거리 이동시키는 대차부의 전진 및 대차부 고정단계; 대차부의 작업판(55) 하강단계; 제1-3컨틸레버부의 설치 및 고정단계; 대차부 분리단계; 대차부 후진단계; 대차부의 작업판 상승단계; 순차적인 컨틸레버부의 설치단계; 제2-1컨틸레버부의 설치단계; 제2차 지지강관 설치단계; 제2-2컨틸레버부 및 순차적인 컨틸레버부의 설치단계; 및 순차적인 지지강관 설치단계 및 컨틸레버부 설치단계 각각이 완료된 이후 대차부의 회수단계; 제1, 2차 및 후속하는 차수에 따라 각 컨틸레버부에 고정된 지지강관 상면부위에의 디딤데크(60) 설치단계;를 포함하는 데크로드 시공방법 및 이에 의해 시공되는 데크로드를 제공한다.
Construction method of deck road and deck road thereof
The present invention provides a deck road construction method and a deck road constructed thereby. The deck road construction method comprises: a step of installing each of first-1 and first-2 cantilever parts; a step of installing a first support pipe; a step of preparing a trolley part; a step of advancing and fixing the trolley part to move the trolley part forward to a predetermined distance; a step of lowering a work board (55) of the trolley part; a step of installing and fixing a first-3 cantilever part; a step of separating the trolley part; a step of moving the trolley part backward; a step of raising the work board of the trolley part; a step of sequentially installing the cantilever parts; a step of installing a second-1 cantilever part; a step of installing a second support pipe; a step of installing a second-2 cantilever part and sequentially installing cantilever parts; and after completion of the step of sequentially installing the support pipes and the step of sequentially installing the cantilever parts, a step of recovering the trolley part; and a step of installing stepping decks (60) on the upper surface of the support pipes fixed to each cantilever part according to first, second, and subsequent orders. Therefore, the deck road construction method can significantly reduce construction duration and costs.
본 발명은, 제1-1, 1-2컨틸레버부 각각의 설치단계; 제1차 지지강관 설치단계; 대차부 준비단계; 대차부를 전방으로 일정거리 이동시키는 대차부의 전진 및 대차부 고정단계; 대차부의 작업판(55) 하강단계; 제1-3컨틸레버부의 설치 및 고정단계; 대차부 분리단계; 대차부 후진단계; 대차부의 작업판 상승단계; 순차적인 컨틸레버부의 설치단계; 제2-1컨틸레버부의 설치단계; 제2차 지지강관 설치단계; 제2-2컨틸레버부 및 순차적인 컨틸레버부의 설치단계; 및 순차적인 지지강관 설치단계 및 컨틸레버부 설치단계 각각이 완료된 이후 대차부의 회수단계; 제1, 2차 및 후속하는 차수에 따라 각 컨틸레버부에 고정된 지지강관 상면부위에의 디딤데크(60) 설치단계;를 포함하는 데크로드 시공방법 및 이에 의해 시공되는 데크로드를 제공한다.
Construction method of deck road and deck road thereof
데크로드 시공방법 및 이에 의해 시공되는 데크로드
PYO HAE YUN (Autor:in)
16.10.2023
Patent
Elektronische Ressource
Koreanisch