PREFABRICATED RAHMEN BRIDGE AND CONSTRUCTION METHOD THEREOF
The present invention relates to a steel composite rigid frame bridge and a construction method for the same. The construction method includes: a step of preparing an extension unit forming an end of a bridge upper structure and extended to a bridge axis direction, a wall integrally formed with the extension unit and forming a bridge lower structure, an opening corner steel girder embedded in order for an end to be exposed to the extension unit, and a point precast member having an accommodation groove formed on the bottom of the wall; a pile constructing step of fixing a pile onto the ground in order for a head part to be exposed; a point precast member installing step of inserting the head part of the pile into the accommodation groove formed on the bottom of the wall of the point precast member and injecting a grouting material into a space formed by the accommodation groove and the outer circumference of the head part of the pile to integrate the pile with the point precast member; a span unit girder constructing step of connecting a prepared span unit steel girder to an opening corner unit steel girder in the longitudinal direction; a bottom plate mounting step of mounting a prefabricated precast bottom plate on the upper side of the span unit steel girder; and a bottom plate fixing step of connecting the span unit steel girder and the precast bottom plate. The steel composite rigid frame can maintain a stable structure system in which stress is not concentrated in an opening corer unit of a rigid frame bridge and is dispersed. The steel composite rigid frame can remarkably reduce construction time of the rigid frame bridge.
본 발명은 강합성 라멘교 및 그 시공 방법에 관한 것으로, 교량 상부구조의 단부를 이루며 교축방향으로 연장되도록 구성된 연장부와, 상기 연장부와 일체로 형성되어 교량 하부구조를 이루는 벽체와, 상기 연장부에 끝단이 노출되도록 내설된 우각부 강재거더와, 상기 벽체의 저면에 형성된 수용홈을 갖는 지점부 프리캐스트 부재를 준비하는 단계와; 두부가 노출된 형태로 지반에 파일(pile)을 고정시키는 파일설치단계와; 상기 지점부 프리캐스트 부재의 벽체 저면에 형성된 상기 수용홈에 상기 파일의 두부를 삽입시키고 상기 수용홈과 상기 파일 두부의 외주면이 이루는 공간에 그라우팅재를 주입하여 상기 지점부 프리캐스트 부재와 상기 파일을 일체화하는 지점부 프리캐스트 부재 설치단계와; 미리 준비된 경간부 강재거더를 상기 우각부 강재거더에 종방향으로 연결 설치하는 경간부 거더 설치단계와; 상기 경간부 강재거더의 상측에 미리 제작된 프리캐스트 바닥판을 거치시키는 바닥판 거치단계와; 상기 경간부 강재거더와 상기 프리캐스트 바닥판을 결합시키는 바닥판 고정단계를; 포함하여 구성되어, 라멘교의 우각부에 응력이 집중되지 않고 분산되면서 안정된 구조계를 유지할 수 있으면서, 라멘교의 시공 시간을 크게 단축할 수 있는 강합성 라멘교 및 그 시공 방법을 제공한다.
PREFABRICATED RAHMEN BRIDGE AND CONSTRUCTION METHOD THEREOF
The present invention relates to a steel composite rigid frame bridge and a construction method for the same. The construction method includes: a step of preparing an extension unit forming an end of a bridge upper structure and extended to a bridge axis direction, a wall integrally formed with the extension unit and forming a bridge lower structure, an opening corner steel girder embedded in order for an end to be exposed to the extension unit, and a point precast member having an accommodation groove formed on the bottom of the wall; a pile constructing step of fixing a pile onto the ground in order for a head part to be exposed; a point precast member installing step of inserting the head part of the pile into the accommodation groove formed on the bottom of the wall of the point precast member and injecting a grouting material into a space formed by the accommodation groove and the outer circumference of the head part of the pile to integrate the pile with the point precast member; a span unit girder constructing step of connecting a prepared span unit steel girder to an opening corner unit steel girder in the longitudinal direction; a bottom plate mounting step of mounting a prefabricated precast bottom plate on the upper side of the span unit steel girder; and a bottom plate fixing step of connecting the span unit steel girder and the precast bottom plate. The steel composite rigid frame can maintain a stable structure system in which stress is not concentrated in an opening corer unit of a rigid frame bridge and is dispersed. The steel composite rigid frame can remarkably reduce construction time of the rigid frame bridge.
본 발명은 강합성 라멘교 및 그 시공 방법에 관한 것으로, 교량 상부구조의 단부를 이루며 교축방향으로 연장되도록 구성된 연장부와, 상기 연장부와 일체로 형성되어 교량 하부구조를 이루는 벽체와, 상기 연장부에 끝단이 노출되도록 내설된 우각부 강재거더와, 상기 벽체의 저면에 형성된 수용홈을 갖는 지점부 프리캐스트 부재를 준비하는 단계와; 두부가 노출된 형태로 지반에 파일(pile)을 고정시키는 파일설치단계와; 상기 지점부 프리캐스트 부재의 벽체 저면에 형성된 상기 수용홈에 상기 파일의 두부를 삽입시키고 상기 수용홈과 상기 파일 두부의 외주면이 이루는 공간에 그라우팅재를 주입하여 상기 지점부 프리캐스트 부재와 상기 파일을 일체화하는 지점부 프리캐스트 부재 설치단계와; 미리 준비된 경간부 강재거더를 상기 우각부 강재거더에 종방향으로 연결 설치하는 경간부 거더 설치단계와; 상기 경간부 강재거더의 상측에 미리 제작된 프리캐스트 바닥판을 거치시키는 바닥판 거치단계와; 상기 경간부 강재거더와 상기 프리캐스트 바닥판을 결합시키는 바닥판 고정단계를; 포함하여 구성되어, 라멘교의 우각부에 응력이 집중되지 않고 분산되면서 안정된 구조계를 유지할 수 있으면서, 라멘교의 시공 시간을 크게 단축할 수 있는 강합성 라멘교 및 그 시공 방법을 제공한다.
PREFABRICATED RAHMEN BRIDGE AND CONSTRUCTION METHOD THEREOF
강합성 라멘교 및 그 시공 방법
PARK JAE HYUN (Autor:in) / CHA EUN JUNG (Autor:in)
19.07.2016
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Prefabricated bridge assembly, prefabricated bridge and construction method of prefabricated bridge
Europäisches Patentamt | 2023
|Prefabricated bridge pier and construction method thereof
Europäisches Patentamt | 2023
|PREFABRICATED PRECAST BRIDGE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2020
|PREFABRICATED PRECAST BRIDGE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2020
|