ACCELERATED CONSTRUCTION METHOD OF INTEGRAL ABUTMENT BRIDGE AND CHAMBERED PRECAST SEGMENT WALL APPLIED TO THE SAME
Disclosed is an integral rapid abutment constructing method. The integral rapid abutment constructing method includes the following steps of: (a) installing a plurality of chambered precast walls in which hollow portions is formed with respect to a plurality of temporary piles so that heads of the plurality of piles are inserted into the hollow portions; (b) installing bridge seat parts on the plurality of chambered precast walls and installing girders on the bridge seat parts; (c) assembling and arranging reinforcing bars corresponding to connecting parts and installing molds to form the connecting parts in which slabs and the chambered precast walls are connected to each other; and (d) placing concrete in the hollow portions and the molds at once. Therefore, the integral rapid abutment constructing method can greatly shorten a construction period.
일체식 교대 급속 시공 방법이 개시되며, 상기 일체식 교대 급속 시공 방법은, (a) 가설된 복수의 말뚝에 대하여 중공부가 형성된 복수의 챔버드 프리캐스트 벽체를 상기 복수의 말뚝의 두부가 상기 중공부에 삽입되도록 설치하는 단계; (b) 상기 복수의 챔버드 프리캐스트 벽체 상에 교좌부를 설치하고, 상기 교좌부 상에 거더를 설치하는 단계; (c) 슬래브와 상기 챔버드 프리캐스트 벽체가 연결되는 연결부를 형성하기 위하여, 상기 연결부에 대응하는 철근을 조립 배치하고 거푸집을 설치하는 단계; (d) 상기 중공부와 상기 거푸집 내부에 콘크리트를 일괄 타설하는 단계를 포함한다.
ACCELERATED CONSTRUCTION METHOD OF INTEGRAL ABUTMENT BRIDGE AND CHAMBERED PRECAST SEGMENT WALL APPLIED TO THE SAME
Disclosed is an integral rapid abutment constructing method. The integral rapid abutment constructing method includes the following steps of: (a) installing a plurality of chambered precast walls in which hollow portions is formed with respect to a plurality of temporary piles so that heads of the plurality of piles are inserted into the hollow portions; (b) installing bridge seat parts on the plurality of chambered precast walls and installing girders on the bridge seat parts; (c) assembling and arranging reinforcing bars corresponding to connecting parts and installing molds to form the connecting parts in which slabs and the chambered precast walls are connected to each other; and (d) placing concrete in the hollow portions and the molds at once. Therefore, the integral rapid abutment constructing method can greatly shorten a construction period.
일체식 교대 급속 시공 방법이 개시되며, 상기 일체식 교대 급속 시공 방법은, (a) 가설된 복수의 말뚝에 대하여 중공부가 형성된 복수의 챔버드 프리캐스트 벽체를 상기 복수의 말뚝의 두부가 상기 중공부에 삽입되도록 설치하는 단계; (b) 상기 복수의 챔버드 프리캐스트 벽체 상에 교좌부를 설치하고, 상기 교좌부 상에 거더를 설치하는 단계; (c) 슬래브와 상기 챔버드 프리캐스트 벽체가 연결되는 연결부를 형성하기 위하여, 상기 연결부에 대응하는 철근을 조립 배치하고 거푸집을 설치하는 단계; (d) 상기 중공부와 상기 거푸집 내부에 콘크리트를 일괄 타설하는 단계를 포함한다.
ACCELERATED CONSTRUCTION METHOD OF INTEGRAL ABUTMENT BRIDGE AND CHAMBERED PRECAST SEGMENT WALL APPLIED TO THE SAME
일체식 교대 급속 시공 방법 및 이에 적용되는 챔버드 프리캐스트 벽체
CHOI DAE HUN (Autor:in) / PARK JAE YONG (Autor:in) / CHOI JIN WOO (Autor:in) / CHUNG JIN HEE (Autor:in) / NAM JUN MO (Autor:in)
07.08.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Integral Abutment Bridge Design and Construction
NTIS | 1987
|