Construction Method of Bridge Structures Using Segmented Preflex Girders and Segmented Preflex Girder
The present invention relates to a method of constructing a bridge structure using a segmented pre-flex girder and a segmented pre-flex girder. The method includes the following steps of: applying a pre-flex load in a state wherein an upper flange, a web and a lower part are assembled in a longitudinal direction and continued; installing a rebar and a sheath pipe in a lower flange of the continued segmentation member, and forming a block-out part at an end of an adjacent segmentation member; placing and curing casing concrete in the lower flange to manufacture a steel composite girder; applying pre-compression stress to the casing concrete, removing the pre-flex load introduced into the steel composite girder; transporting the steel composite girder to a site by separating the girder; recontinuing the segmented steel composite girder on the site; continuing block-out parts of the continued steel composite girder by inserting a steel support block between the block-out parts; placing the steel composite girder on a bridge pier or abutment after lifting up the same; installing a sheath pipe joint member in the block-out parts of the placed steel composite girder and inserting a strand; placing and curing concrete in the block-out parts; applying post-compression stress, introducing and settling prestress into the continued casing concrete through the strand; and placing rebars in a web and a slab of the steel composite girder and placing and curing concrete in the same. Therefore, the present invention is capable of effectively coping with problems which can occur throughout steps including manufacture and installation.
본 발명은 분절형 프리플렉스 거더를 활용한 교량 구조물의 시공방법에 관한 것으로서, 상부플랜지 및 복부, 하부 를 길이방향으로 조립하여 연속화 시킨 상태에서 프리플렉션 하중을 가력하는 단계; 및 연속화된 상기 분절부재의 하부 플랜지에 철근 및 쉬스관을 구비하고, 인접하는 분절부재의 단부에 블록아웃부를 형성하는 단계; 및 하부플랜지에 케이싱 콘크리트를 타설 및 양생하여 강합성 거더를 제작하는 단계; 및 상기 강합성 거더에 도입된 프리플렉션 하중을 제거하는 것으로 케이싱 콘크리트에 선 압축응력을 가하는 단계; 및 강합성 거더를 분리하여 현장으로 운반하는 단계; 및 분절된 상기 강합성 거더를 현장에서 재연속화시키는 단계; 및 재연속화된 강합성 거더의 블록아웃부 사이에 강재지지블록을 삽입하여 블록아웃부를 연속화시키는 단계; 및 상기 강합성 거더를 인양 후 교각 또는 교대에 거치하는 단계; 및, 거치된 강합성 거더의 블록아웃부에 쉬스관 이음부재 설치 및 강연선을 삽입하는 단계; 및 상기 블록아웃부에 콘크리트를 타설하고 양생하는 단계; 및 연속화된 케이싱 콘크리트에 강연선으로 프리스트레스를 도입 및 정착하는 것으로 후 압축응력을 가하는 단계; 및 강합성 거더의 복부 및 슬래브에 철근 배근 및 콘크리트를 타설하고 양생하는 단계; 를 포함한다.
Construction Method of Bridge Structures Using Segmented Preflex Girders and Segmented Preflex Girder
The present invention relates to a method of constructing a bridge structure using a segmented pre-flex girder and a segmented pre-flex girder. The method includes the following steps of: applying a pre-flex load in a state wherein an upper flange, a web and a lower part are assembled in a longitudinal direction and continued; installing a rebar and a sheath pipe in a lower flange of the continued segmentation member, and forming a block-out part at an end of an adjacent segmentation member; placing and curing casing concrete in the lower flange to manufacture a steel composite girder; applying pre-compression stress to the casing concrete, removing the pre-flex load introduced into the steel composite girder; transporting the steel composite girder to a site by separating the girder; recontinuing the segmented steel composite girder on the site; continuing block-out parts of the continued steel composite girder by inserting a steel support block between the block-out parts; placing the steel composite girder on a bridge pier or abutment after lifting up the same; installing a sheath pipe joint member in the block-out parts of the placed steel composite girder and inserting a strand; placing and curing concrete in the block-out parts; applying post-compression stress, introducing and settling prestress into the continued casing concrete through the strand; and placing rebars in a web and a slab of the steel composite girder and placing and curing concrete in the same. Therefore, the present invention is capable of effectively coping with problems which can occur throughout steps including manufacture and installation.
본 발명은 분절형 프리플렉스 거더를 활용한 교량 구조물의 시공방법에 관한 것으로서, 상부플랜지 및 복부, 하부 를 길이방향으로 조립하여 연속화 시킨 상태에서 프리플렉션 하중을 가력하는 단계; 및 연속화된 상기 분절부재의 하부 플랜지에 철근 및 쉬스관을 구비하고, 인접하는 분절부재의 단부에 블록아웃부를 형성하는 단계; 및 하부플랜지에 케이싱 콘크리트를 타설 및 양생하여 강합성 거더를 제작하는 단계; 및 상기 강합성 거더에 도입된 프리플렉션 하중을 제거하는 것으로 케이싱 콘크리트에 선 압축응력을 가하는 단계; 및 강합성 거더를 분리하여 현장으로 운반하는 단계; 및 분절된 상기 강합성 거더를 현장에서 재연속화시키는 단계; 및 재연속화된 강합성 거더의 블록아웃부 사이에 강재지지블록을 삽입하여 블록아웃부를 연속화시키는 단계; 및 상기 강합성 거더를 인양 후 교각 또는 교대에 거치하는 단계; 및, 거치된 강합성 거더의 블록아웃부에 쉬스관 이음부재 설치 및 강연선을 삽입하는 단계; 및 상기 블록아웃부에 콘크리트를 타설하고 양생하는 단계; 및 연속화된 케이싱 콘크리트에 강연선으로 프리스트레스를 도입 및 정착하는 것으로 후 압축응력을 가하는 단계; 및 강합성 거더의 복부 및 슬래브에 철근 배근 및 콘크리트를 타설하고 양생하는 단계; 를 포함한다.
Construction Method of Bridge Structures Using Segmented Preflex Girders and Segmented Preflex Girder
분절형 프리플렉스 거더를 활용한 교량 구조물의 시공방법 및 분절형 프리플렉스 거더
LEE MAENG MOO (Autor:in)
23.02.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
preflex steel girder manufacturing apparatus and preflex steel girder manufacturing method
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2016
|CONSTRUCTION METHOD OF MULTI PREFLEX COMPOSITE GIRDER
Europäisches Patentamt | 2019
|Online Contents | 1998
|The manufacturing method of preflex steel girder and a preflex steel girder manufactured by the same
Europäisches Patentamt | 2017
|