CONSTRUCTION METHOD FOR SHIELD TUNNELS PASSING UNDERNEATH VIADUCT IN MULTI-INTERVAL, SMALL-CLEAR-DISTANCE AND OVERLAPPING MANNER
Disclosed is a construction method for shield tunnels passing underneath a viaduct in a multi-interval, small-clear-distance and overlapping manner. The construction method comprises the following steps: according to a principle of having the minimal deformation effect on pile foundations of a viaduct and the surrounding environment, formulating an optimal construction sequence for constructing shield tunnels passing underneath the viaduct in a multi-interval and overlapping manner; before a tunnel passes underneath the viaduct, carrying out active isolation reinforcement for construction in which a shield passes underneath for a short distance; constructing the shield tunnel passing underneath the viaduct; in an area where a plurality of shield tunnel sections pass underneath the viaduct in an overlapping manner, reinforcing a segment structure of the shield tunnel and reinforcing the interior of a tunnel hole; and carrying out track vibration reduction and isolation control in a section where the shield tunnel passes underneath the viaduct.
L'invention concerne un procédé de construction pour des tunnels de protection passant sous un viaduc à de multiples intervalles, séparés par une faible distance de dégagement et se chevauchant. Le procédé de construction comprend les étapes suivantes consistant à : selon le principe d'avoir l'effet de déformation minimale sur des fondations de piles d'un viaduc et l'environnement ambiant, formuler une séquence de construction optimale pour construire des tunnels de protection passant sous le viaduc à de multiples intervalles et se chevauchant ; avant le passage d'un tunnel sous le viaduc, réaliser un renforcement d'isolation actif pour une construction sous laquelle une protection passe sur une courte distance ; construire le tunnel de protection passant sous le viaduc ; dans une zone où une pluralité de sections de tunnel de protection passent sous le viaduc en se chevauchant, renforcer une structure de segment du tunnel de protection et renforcer l'intérieur d'un trou de tunnel ; et réaliser une commande d'isolation et de réduction des vibrations de voie dans une section où le tunnel de protection passe sous le viaduc.
一种盾构隧道多区间、小净距、交叠下穿高架桥的施工方法,包括步骤如下:按照对高架桥桩基及周边环境变形影响最小的原则,制定盾构隧道多区间、叠落下穿高架桥施工的最优施工顺序;在隧道下穿高架桥之前,进行盾构近距离下穿施工的主动隔离加固;进行盾构隧道下穿高架桥的施工;在多盾构隧道区间交叠下穿高架桥的区域,对盾构隧道的管片结构进行加强,对隧道洞内进行加固;在盾构隧道下穿高架桥区段进行轨道减隔振控制。
CONSTRUCTION METHOD FOR SHIELD TUNNELS PASSING UNDERNEATH VIADUCT IN MULTI-INTERVAL, SMALL-CLEAR-DISTANCE AND OVERLAPPING MANNER
Disclosed is a construction method for shield tunnels passing underneath a viaduct in a multi-interval, small-clear-distance and overlapping manner. The construction method comprises the following steps: according to a principle of having the minimal deformation effect on pile foundations of a viaduct and the surrounding environment, formulating an optimal construction sequence for constructing shield tunnels passing underneath the viaduct in a multi-interval and overlapping manner; before a tunnel passes underneath the viaduct, carrying out active isolation reinforcement for construction in which a shield passes underneath for a short distance; constructing the shield tunnel passing underneath the viaduct; in an area where a plurality of shield tunnel sections pass underneath the viaduct in an overlapping manner, reinforcing a segment structure of the shield tunnel and reinforcing the interior of a tunnel hole; and carrying out track vibration reduction and isolation control in a section where the shield tunnel passes underneath the viaduct.
L'invention concerne un procédé de construction pour des tunnels de protection passant sous un viaduc à de multiples intervalles, séparés par une faible distance de dégagement et se chevauchant. Le procédé de construction comprend les étapes suivantes consistant à : selon le principe d'avoir l'effet de déformation minimale sur des fondations de piles d'un viaduc et l'environnement ambiant, formuler une séquence de construction optimale pour construire des tunnels de protection passant sous le viaduc à de multiples intervalles et se chevauchant ; avant le passage d'un tunnel sous le viaduc, réaliser un renforcement d'isolation actif pour une construction sous laquelle une protection passe sur une courte distance ; construire le tunnel de protection passant sous le viaduc ; dans une zone où une pluralité de sections de tunnel de protection passent sous le viaduc en se chevauchant, renforcer une structure de segment du tunnel de protection et renforcer l'intérieur d'un trou de tunnel ; et réaliser une commande d'isolation et de réduction des vibrations de voie dans une section où le tunnel de protection passe sous le viaduc.
一种盾构隧道多区间、小净距、交叠下穿高架桥的施工方法,包括步骤如下:按照对高架桥桩基及周边环境变形影响最小的原则,制定盾构隧道多区间、叠落下穿高架桥施工的最优施工顺序;在隧道下穿高架桥之前,进行盾构近距离下穿施工的主动隔离加固;进行盾构隧道下穿高架桥的施工;在多盾构隧道区间交叠下穿高架桥的区域,对盾构隧道的管片结构进行加强,对隧道洞内进行加固;在盾构隧道下穿高架桥区段进行轨道减隔振控制。
CONSTRUCTION METHOD FOR SHIELD TUNNELS PASSING UNDERNEATH VIADUCT IN MULTI-INTERVAL, SMALL-CLEAR-DISTANCE AND OVERLAPPING MANNER
PROCÉDÉ DE CONSTRUCTION POUR TUNNELS DE PROTECTION PASSANT SOUS UN VIADUC À DE MULTIPLES INTERVALLES, SÉPARES PAR UNE FAIBLE DISTANCE DE DÉGAGEMENT ET SE CHEVAUCHANT
一种盾构隧道多区间、小净距、交叠下穿高架桥施工方法
SUN JIECHENG (Autor:in) / LU LINHAI (Autor:in) / LIU RUIQI (Autor:in) / HU YONGLI (Autor:in) / HAN SHUAI (Autor:in)
12.11.2020
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Construction method of subway shield tunnel underneath passing viaduct tunnel
Europäisches Patentamt | 2022
|Shield construction method for subway underneath passing highway
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|