ENVIRONMENTALLY FRIENDLY SUBMARINE DCM PILE HEAD CLEARING CONSTRUCTION PROCESS
An environmentally friendly submarine DCM pile head clearing construction process. The construction process comprises the following steps: step I, maintaining construction devices on an overwater breaking and excavation platform (1); step II, driving the overwater breaking and excavation platform (1) to the position above an area to be subjected to breaking and excavation, and fixing the overwater breaking and excavation platform (1) by means of twisting anchor cables (7); step III, selecting a DCM test area for a breaking and excavation typical construction test; step IV, lowering a grab bucket (5) to a DCM pile head body (6) for breaking and excavation; step V, driving the overwater breaking and excavation platform (1) out of a first excavation area (13), performing a multi-beam water depth measurement on a second excavation area (14), and establishing a three-dimensional geomorphologic map of the second excavation area (14); step VI, analyzing a three-dimensional geomorphologic map after breaking and excavation, and according to step IV to step V, continuing construction in an under-excavation area which does not reach a designed elevation; and step VII, preparing for breaking and excavation of the next area, and circulating in this way.
Processus de construction de dégagement de tête de pieu DCM sous-marin respectueux de l'environnement. Le processus de construction comprend les étapes suivantes : étape I, le maintien de dispositifs de construction sur une plateforme de rupture et d'excavation d'eau (1) ; étape II, l'entraînement de la plateforme de rupture et d'excavation d'eau (1) à la position au-dessus d'une zone à soumettre à la rupture et à l'excavation, et la fixation de la plateforme de rupture et d'excavation d'eau (1) au moyen de câbles d'ancrage de torsion (7) ; étape III, la sélection d'une zone de test DCM pour un test de construction typique de rupture et d'excavation ; étape IV, l'abaissement d'un godet de préhension (5) vers un corps de tête de pieu DCM (6) pour la rupture et l'excavation ; étape V, l'entraînement de la plateforme de rupture et d'excavation d'eau excessive (1) hors d'une première zone d'excavation (13), la réalisation d'une mesure de profondeur d'eau à faisceaux multiples sur une seconde zone d'excavation (14) et l'établissement d'une carte géomorphologique tridimensionnelle de la seconde zone d'excavation (14) ; étape VI, l'analyse d'une carte géomorphologique tridimensionnelle après la rupture et l'excavation, et selon l'étape IV à l'étape V, la poursuite de la construction dans une zone de sous-excavation qui n'atteint pas une élévation conçue ; et étape VII, la préparation pour la rupture et l'excavation de la zone suivante, et la circulation de cette manière.
一种环保型海底DCM桩头清除施工工艺,该施工工艺包括以下步骤:第一步:检修水上破除开挖平台(1)的各类施工设备;第二步:将水上破除开挖平台(1)行驶移至待破除开挖区域上方,通过绞锚缆(7)固定水上破除开挖平台(1);第三步:选取DCM试验区域进行破除开挖典型施工试验;第四步:将抓斗(5)下放至DCM桩头主体(6)处进行破除开挖;第五步:将水上破除开挖平台(1)驶出第一开挖区域(13),对第二开挖区域(14)进行多波束水深测量,建立第二开挖区域(14)的三维地貌图形;第六步:分析破除开挖后的三维地貌图形,对没有达到设计标高的欠挖区域按照第四至第五步继续施工;第七步:进行下一区域的破除开挖准备工作,以此循环。
ENVIRONMENTALLY FRIENDLY SUBMARINE DCM PILE HEAD CLEARING CONSTRUCTION PROCESS
An environmentally friendly submarine DCM pile head clearing construction process. The construction process comprises the following steps: step I, maintaining construction devices on an overwater breaking and excavation platform (1); step II, driving the overwater breaking and excavation platform (1) to the position above an area to be subjected to breaking and excavation, and fixing the overwater breaking and excavation platform (1) by means of twisting anchor cables (7); step III, selecting a DCM test area for a breaking and excavation typical construction test; step IV, lowering a grab bucket (5) to a DCM pile head body (6) for breaking and excavation; step V, driving the overwater breaking and excavation platform (1) out of a first excavation area (13), performing a multi-beam water depth measurement on a second excavation area (14), and establishing a three-dimensional geomorphologic map of the second excavation area (14); step VI, analyzing a three-dimensional geomorphologic map after breaking and excavation, and according to step IV to step V, continuing construction in an under-excavation area which does not reach a designed elevation; and step VII, preparing for breaking and excavation of the next area, and circulating in this way.
Processus de construction de dégagement de tête de pieu DCM sous-marin respectueux de l'environnement. Le processus de construction comprend les étapes suivantes : étape I, le maintien de dispositifs de construction sur une plateforme de rupture et d'excavation d'eau (1) ; étape II, l'entraînement de la plateforme de rupture et d'excavation d'eau (1) à la position au-dessus d'une zone à soumettre à la rupture et à l'excavation, et la fixation de la plateforme de rupture et d'excavation d'eau (1) au moyen de câbles d'ancrage de torsion (7) ; étape III, la sélection d'une zone de test DCM pour un test de construction typique de rupture et d'excavation ; étape IV, l'abaissement d'un godet de préhension (5) vers un corps de tête de pieu DCM (6) pour la rupture et l'excavation ; étape V, l'entraînement de la plateforme de rupture et d'excavation d'eau excessive (1) hors d'une première zone d'excavation (13), la réalisation d'une mesure de profondeur d'eau à faisceaux multiples sur une seconde zone d'excavation (14) et l'établissement d'une carte géomorphologique tridimensionnelle de la seconde zone d'excavation (14) ; étape VI, l'analyse d'une carte géomorphologique tridimensionnelle après la rupture et l'excavation, et selon l'étape IV à l'étape V, la poursuite de la construction dans une zone de sous-excavation qui n'atteint pas une élévation conçue ; et étape VII, la préparation pour la rupture et l'excavation de la zone suivante, et la circulation de cette manière.
一种环保型海底DCM桩头清除施工工艺,该施工工艺包括以下步骤:第一步:检修水上破除开挖平台(1)的各类施工设备;第二步:将水上破除开挖平台(1)行驶移至待破除开挖区域上方,通过绞锚缆(7)固定水上破除开挖平台(1);第三步:选取DCM试验区域进行破除开挖典型施工试验;第四步:将抓斗(5)下放至DCM桩头主体(6)处进行破除开挖;第五步:将水上破除开挖平台(1)驶出第一开挖区域(13),对第二开挖区域(14)进行多波束水深测量,建立第二开挖区域(14)的三维地貌图形;第六步:分析破除开挖后的三维地貌图形,对没有达到设计标高的欠挖区域按照第四至第五步继续施工;第七步:进行下一区域的破除开挖准备工作,以此循环。
ENVIRONMENTALLY FRIENDLY SUBMARINE DCM PILE HEAD CLEARING CONSTRUCTION PROCESS
PROCESSUS DE CONSTRUCTION DE DÉGAGEMENT DE TÊTE DE PIEU DCM SOUS-MARIN RESPECTUEUX DE L'ENVIRONNEMENT
一种环保型海底DCM桩头清除施工工艺
MA DINGQIANG (Autor:in) / LI ZHONGHAO (Autor:in) / LIAO ZENGPING (Autor:in) / ZHONG XUHUA (Autor:in) / YANG ZHENHUA (Autor:in) / ZHANG PENG (Autor:in) / YU MINGJIE (Autor:in) / ZHANG YINGKAI (Autor:in) / HU QIAN (Autor:in) / LUO ZIQIANG (Autor:in)
28.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile cutting equipment for environmentally-friendly building pile foundation
Europäisches Patentamt | 2020
|Environmentally friendly material for the construction of pile foundations on permafrost
DOAJ | 2023
|ENVIRONMENTALLY-CONSIDERATE PILE HEAD PROCESSING METHOD
Europäisches Patentamt | 2016
|Energy-saving and environmentally friendly high-accuracy pile driver for building construction
Europäisches Patentamt | 2020
|Environment-friendly seabed DCM pile head removing construction technology
Europäisches Patentamt | 2022
|