Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
TUBE JOINT STEEL PLATE CONCRETE COMBINED STRUCTURE FOR IMMERSED TUBE TUNNEL, AND METHOD FOR MANUFACTURING TUBE JOINT STEEL PLATE CONCRETE COMBINED STRUCTURE
The present invention relates to the technical field of immersed tube tunnels, and provides a tube joint steel plate concrete combined structure for an immersed tube tunnel, and a method for manufacturing the tube joint steel plate concrete combined structure. The combined structure comprises a top plate structure, an outer wall structure, a middle wall structure, and a bottom plate structure, wherein the top plate structure has an opening portion, and comprises a steel plate assembly, connecting elements and steel bars, the steel bars being connected to the steel plate assembly by means of the connecting elements to form a framework structure, and concrete being poured into the framework structure through the opening portion; and each of the outer wall structure, the middle wall structure and the bottom plate structure comprises a closed steel-clad steel shell, and concrete is poured into the closed steel-clad steel shells. According to the present invention, the overall strength, rigidity, waterproofness and durability of the tube joint structure can be met, the convenience of pouring construction on tube joint concrete is improved by means of the opening type operation condition of the top plate structure, and the construction quality is guaranteed; moreover, common concrete can be used, such that the manufacturing cost is greatly saved on. The structure and the construction method are suitable for underwater floating state pouring construction of immersed tube tunnels, and can also be applied to immersed tube tunnels under various conditions.
La présente invention se rapporte au domaine technique des tunnels de tube immergés, et concerne une structure combinée de béton de plaque d'acier de joint de tube pour un tunnel de tube immergé, et un procédé de fabrication de la structure combinée de béton de plaque d'acier de joint de tube. La structure combinée comprend une structure de plaque supérieure, une structure de paroi externe, une structure de paroi intermédiaire et une structure de plaque inférieure ; la structure de plaque supérieure présente une partie d'ouverture, et comprend un ensemble plaque d'acier, des éléments de liaison et des barres d'acier, les barres d'acier étant reliées à l'ensemble plaque d'acier au moyen des éléments de liaison pour former une structure d'ossature, et du béton étant injecté dans la structure d'ossature à travers la partie d'ouverture ; et chacune de la structure de paroi externe, de la structure de paroi intermédiaire et de la structure de plaque inférieure comprend une coque en acier à gainage en acier fermée, et du béton est versé dans les coques en acier à gainage en acier fermées. Selon la présente invention, la résistance globale, la rigidité, l'étanchéité à l'eau et la durabilité de la structure de joint de tube peuvent être satisfaites, la commodité de construction d'injection sur du béton de joint de tube est améliorée au moyen de l'état de fonctionnement de type d'ouverture de la structure de plaque supérieure, et la qualité de construction est garantie ; de plus, du béton commun peut être utilisé, de telle sorte que le coût de fabrication est considérablement économisé. La structure et le procédé de construction sont appropriés pour la construction d'injection à l'état flottant sous-marin de tunnels de tube immergés, et peuvent également être appliqués à des tunnels de tube immergés dans diverses conditions.
本发明涉及沉管隧道技术领域,提供一种沉管隧道用管节钢板混凝土组合结构及其制造方法。该组合结构包括:顶板结构、外墙结构、中墙结构和底板结构;顶板结构具有敞口部,顶板结构包括钢板组件、连接件和钢筋,钢筋通过连接件与钢板组件连接并形成骨架结构,通过敞口部向骨架结构浇注混凝土;外墙结构、中墙和底板结构均包括封闭外包钢壳,封闭外包钢壳内浇注混凝土。本发明能够在满足管节结构的整体强度、刚度、防水性、耐久性的同时,通过顶板结构敞口式作业条件以提高管节混凝土浇筑施工的便利性,保证施工质量,同时可采用普通混凝土,大大节省了造价,该结构和施工方法适用于水下浮态浇筑施工的沉管隧道,也可应用其它各种条件下的沉管隧道。
TUBE JOINT STEEL PLATE CONCRETE COMBINED STRUCTURE FOR IMMERSED TUBE TUNNEL, AND METHOD FOR MANUFACTURING TUBE JOINT STEEL PLATE CONCRETE COMBINED STRUCTURE
The present invention relates to the technical field of immersed tube tunnels, and provides a tube joint steel plate concrete combined structure for an immersed tube tunnel, and a method for manufacturing the tube joint steel plate concrete combined structure. The combined structure comprises a top plate structure, an outer wall structure, a middle wall structure, and a bottom plate structure, wherein the top plate structure has an opening portion, and comprises a steel plate assembly, connecting elements and steel bars, the steel bars being connected to the steel plate assembly by means of the connecting elements to form a framework structure, and concrete being poured into the framework structure through the opening portion; and each of the outer wall structure, the middle wall structure and the bottom plate structure comprises a closed steel-clad steel shell, and concrete is poured into the closed steel-clad steel shells. According to the present invention, the overall strength, rigidity, waterproofness and durability of the tube joint structure can be met, the convenience of pouring construction on tube joint concrete is improved by means of the opening type operation condition of the top plate structure, and the construction quality is guaranteed; moreover, common concrete can be used, such that the manufacturing cost is greatly saved on. The structure and the construction method are suitable for underwater floating state pouring construction of immersed tube tunnels, and can also be applied to immersed tube tunnels under various conditions.
La présente invention se rapporte au domaine technique des tunnels de tube immergés, et concerne une structure combinée de béton de plaque d'acier de joint de tube pour un tunnel de tube immergé, et un procédé de fabrication de la structure combinée de béton de plaque d'acier de joint de tube. La structure combinée comprend une structure de plaque supérieure, une structure de paroi externe, une structure de paroi intermédiaire et une structure de plaque inférieure ; la structure de plaque supérieure présente une partie d'ouverture, et comprend un ensemble plaque d'acier, des éléments de liaison et des barres d'acier, les barres d'acier étant reliées à l'ensemble plaque d'acier au moyen des éléments de liaison pour former une structure d'ossature, et du béton étant injecté dans la structure d'ossature à travers la partie d'ouverture ; et chacune de la structure de paroi externe, de la structure de paroi intermédiaire et de la structure de plaque inférieure comprend une coque en acier à gainage en acier fermée, et du béton est versé dans les coques en acier à gainage en acier fermées. Selon la présente invention, la résistance globale, la rigidité, l'étanchéité à l'eau et la durabilité de la structure de joint de tube peuvent être satisfaites, la commodité de construction d'injection sur du béton de joint de tube est améliorée au moyen de l'état de fonctionnement de type d'ouverture de la structure de plaque supérieure, et la qualité de construction est garantie ; de plus, du béton commun peut être utilisé, de telle sorte que le coût de fabrication est considérablement économisé. La structure et le procédé de construction sont appropriés pour la construction d'injection à l'état flottant sous-marin de tunnels de tube immergés, et peuvent également être appliqués à des tunnels de tube immergés dans diverses conditions.
本发明涉及沉管隧道技术领域,提供一种沉管隧道用管节钢板混凝土组合结构及其制造方法。该组合结构包括:顶板结构、外墙结构、中墙结构和底板结构;顶板结构具有敞口部,顶板结构包括钢板组件、连接件和钢筋,钢筋通过连接件与钢板组件连接并形成骨架结构,通过敞口部向骨架结构浇注混凝土;外墙结构、中墙和底板结构均包括封闭外包钢壳,封闭外包钢壳内浇注混凝土。本发明能够在满足管节结构的整体强度、刚度、防水性、耐久性的同时,通过顶板结构敞口式作业条件以提高管节混凝土浇筑施工的便利性,保证施工质量,同时可采用普通混凝土,大大节省了造价,该结构和施工方法适用于水下浮态浇筑施工的沉管隧道,也可应用其它各种条件下的沉管隧道。
TUBE JOINT STEEL PLATE CONCRETE COMBINED STRUCTURE FOR IMMERSED TUBE TUNNEL, AND METHOD FOR MANUFACTURING TUBE JOINT STEEL PLATE CONCRETE COMBINED STRUCTURE
STRUCTURE COMBINÉE DE BÉTON DE PLAQUE D'ACIER DE JOINT DE TUBE POUR TUNNEL DE TUBE IMMERGÉ, ET PROCÉDÉ DE FABRICATION DE STRUCTURE COMBINÉE DE BÉTON DE PLAQUE D'ACIER DE JOINT DE TUBE
沉管隧道用管节钢板混凝土组合结构及其制造方法
XU GUOPING (Autor:in) / LIU MINGHU (Autor:in) / WANG YONG (Autor:in) / XU YU (Autor:in) / REN YAOPU (Autor:in) / ZHANG HAIJIA (Autor:in)
14.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Combined immersed tube joint for immersed tube tunnel and construction method
Europäisches Patentamt | 2023
|Construction method of immersed tube joint in immersed tube tunnel and immersed tube joint structure
Europäisches Patentamt | 2021
|Steel tube bundle-corrugated steel plate concrete combined column
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|