Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Proposed Concrete Lining of Main Outlet Drain South Gila Valley, Colorado River Front Work and Levee System, Arizona
The purpose of the proposed project is to prevent the seepage of saline water from the Main Outlet Drain into the Gila River Pilot Channel and the ground-water table of the South Gila Valley. The proposed project is to line the 8-mile-long Main Outlet Drain with concrete. There will be a temporary adverse effect on spawning habits of Tilapia and other fish presently using the unlined drain. Construction will require additional fill material to be obtained from the Gila River flood plain and the drainage water to be bypassed in the Gila River Pilot Channel during construction. (Author)
Proposed Concrete Lining of Main Outlet Drain South Gila Valley, Colorado River Front Work and Levee System, Arizona
The purpose of the proposed project is to prevent the seepage of saline water from the Main Outlet Drain into the Gila River Pilot Channel and the ground-water table of the South Gila Valley. The proposed project is to line the 8-mile-long Main Outlet Drain with concrete. There will be a temporary adverse effect on spawning habits of Tilapia and other fish presently using the unlined drain. Construction will require additional fill material to be obtained from the Gila River flood plain and the drainage water to be bypassed in the Gila River Pilot Channel during construction. (Author)
Proposed Concrete Lining of Main Outlet Drain South Gila Valley, Colorado River Front Work and Levee System, Arizona
1972
39 pages
Report
Keine Angabe
Englisch
The gila river bridge in Arizona
Engineering Index Backfile | 1928
Mineral deposits of the Gila River Indian Reservation, Arizona
TIBKAT | 1969
|