Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Brief Reconnaissance Study for the Addition of Hydropower for Mayodan Dam, Mayodan, North Carolina
The feasibility of retrofitting the Mayodan Dam near Mayodan, North Carolina for power generation was examined. This dam, which has a developable head of 20 ft., was built in 1920 for impounding a small run-of-the-river water reservoir. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site appears to be economically feasible. (ERA citation 08:004586)
Brief Reconnaissance Study for the Addition of Hydropower for Mayodan Dam, Mayodan, North Carolina
The feasibility of retrofitting the Mayodan Dam near Mayodan, North Carolina for power generation was examined. This dam, which has a developable head of 20 ft., was built in 1920 for impounding a small run-of-the-river water reservoir. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site appears to be economically feasible. (ERA citation 08:004586)
Brief Reconnaissance Study for the Addition of Hydropower for Mayodan Dam, Mayodan, North Carolina
T. G. Gebhard (Autor:in)
1982
19 pages
Report
Keine Angabe
Englisch