Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Brief Reconnaissance Study for the Addition of Hydropower for Craggy Dam, Asheville, North Carolina
The feasibility of retrofitting the Craggy Dam near Asheville, NC for power generation was examined. This dam has a developable head of 23 ft., was built in 1903 for electric power generation, and is currently unused. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is feasible, that more power can be produced than can be used by the owner, i.e., the Metropolitan Sewer District of Asheville, and that excess power can be sold to the Carolina Power and Light Co. (ERA citation 07:046142)
Brief Reconnaissance Study for the Addition of Hydropower for Craggy Dam, Asheville, North Carolina
The feasibility of retrofitting the Craggy Dam near Asheville, NC for power generation was examined. This dam has a developable head of 23 ft., was built in 1903 for electric power generation, and is currently unused. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is feasible, that more power can be produced than can be used by the owner, i.e., the Metropolitan Sewer District of Asheville, and that excess power can be sold to the Carolina Power and Light Co. (ERA citation 07:046142)
Brief Reconnaissance Study for the Addition of Hydropower for Craggy Dam, Asheville, North Carolina
T. G. Gebhard (Autor:in)
1982
21 pages
Report
Keine Angabe
Englisch