Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Brief Reconnaissance Study for the Addition of Hydropower for McAdenville Dam, McAdenville, North Carolina
The feasibility of retrofitting the McAdenville Dam near McAdenville, NC for power generation was examined. This dam has a developable head of 20 ft., was built in 1882 to provide power to a textile mill. The study of environmental, institutional, safety and economic factors showed that commercial hydroelectric power development at this site is economically feasible. (ERA citation 07:046146)
Brief Reconnaissance Study for the Addition of Hydropower for McAdenville Dam, McAdenville, North Carolina
The feasibility of retrofitting the McAdenville Dam near McAdenville, NC for power generation was examined. This dam has a developable head of 20 ft., was built in 1882 to provide power to a textile mill. The study of environmental, institutional, safety and economic factors showed that commercial hydroelectric power development at this site is economically feasible. (ERA citation 07:046146)
Brief Reconnaissance Study for the Addition of Hydropower for McAdenville Dam, McAdenville, North Carolina
T. G. Gebhard (Autor:in)
1982
21 pages
Report
Keine Angabe
Englisch