Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Posey Canyon Arch Culvert Instrumentation
The report discusses the instrumentation of an 8-foot diameter reinforced concrete arch culvert under an embankment 240 feet in height. Instruments were installed to provide for measurement of: pressure at the culvert-soil interface, soil pressure within the embankment, deformation of the culvert cross-section, and rotational movement of the culvert footing. Data from periodic readings of the instrumentation are presented. These data are not analyzed in this report. (BPR abstract)
Posey Canyon Arch Culvert Instrumentation
The report discusses the instrumentation of an 8-foot diameter reinforced concrete arch culvert under an embankment 240 feet in height. Instruments were installed to provide for measurement of: pressure at the culvert-soil interface, soil pressure within the embankment, deformation of the culvert cross-section, and rotational movement of the culvert footing. Data from periodic readings of the instrumentation are presented. These data are not analyzed in this report. (BPR abstract)
Posey Canyon Arch Culvert Instrumentation
T. Smith (Autor:in) / W. G. Weber (Autor:in)
1968
48 pages
Report
Keine Angabe
Englisch
Instrumentation for the Apple Canyon Culvert
NTIS | 1966
|Discussion of “Posey on Steel Rigid Frames”
ASCE | 2021
|Reinforced concrete arch culvert reinforcing structure
Europäisches Patentamt | 2024
|